The decoration of home improvement construction covers all problems

[Question] I am a new classmate and will soon be renovated. However, I still have little knowledge of the decoration. Can I help you with all the precautions in the decoration process and decoration? Not grateful!


Answer: The decoration of the construction process:


1. Approaching, demolishing walls, building walls, installing temporary sanitary ware.


2, toilets, kitchen floor 24 hours closed water test.


3, chiseled slot, hydropower reform and acceptance.


4. Sealed trough hidden hydropower renovation project, closed water test without leakage began to do waterproofing project.


5, bathroom, kitchen wall magnetic plate.


6, woodworking approach, hanging ceilings, plaster angle line.


7, package door, window cover. Make wooden cabinet frame.


8, synchronous production of a variety of wooden doors, molded doors and flat pressure.


9, wooden panel brush dust paint (clean oil).


10, windowsill marble countertops laying leveling.


11, wood veneer paste, line production and fine installation.


12, the wall base treatment, grinding, leveling.


13, even home, the door seam joint adhesive (protection edge).


14, wall oil ICI at least three times.


15, furniture paint into the field, make nails, paint.


16, handle corners, laying floor tiles, solid wood or composite wood floors, waterproof marble strips, baseboards.


17, lamps, sanitary ware, handles, door lock installation and commissioning.


18, clean up hygiene, make up the floor tiles, remove the field.


19. The preliminary inspection and acceptance of the decoration company.


20. The tripartite appointment time is formally accepted and delivered to the owner.


[Question] My master said that the ceiling should explode the screw. Want me to buy 50 back. My previous renovation didn't work. Is not the construction process different. Which method is better? My family just used a splint to hang a 50cm wide circle (paste a wall).


Answer: Yes, your master is right. The ceiling is good with explosion screws. The stability of the ceiling can be guaranteed. The ceiling that you used to do is the cement nail. Both methods are available, but it is best to use explosion screws.


[Question] My family's door covers are all covered. The toilet is a pit (developers provide sinking style), and the kitchen is not waterproof.


Answer: Did the original developer not waterproof? If you do not do it now you must do it, pay attention to the waterproof material used to make polyurethane type waterproof material. After the waterproof cushion is done, be careful not to use construction waste. Use ceramic or expanded perlite.


[Question] In the past, developers had a layer of water-repellent waterproof. Is it still necessary to waterproof before filling ceramics? Decoration company to use 801 waterproof, what is the problem? Thank you very much.


Answer: Insurance, it is best to do a waterproof. As for the 801 waterproof, there is no problem, I have said above, waterproof sunken toilet is best to use polyurethane waterproof material.


[Question] Do not understand what is meant by "Cushion after waterproofing can not use construction waste, use ceramic or expanded perlite?" Can you talk about it in detail?


Answer: The floor of the sinking toilet is to be cushioned. The practice of cushioning is divided into fine stone concrete cushion and construction garbage back cushion. The former has high construction cost, so many families take the latter when decorating. It is not desirable, it is best to use ceramsite.


[Question] Do you need to do waterproofing after you remove the magnet from the secondary decoration?


Answer: Waterproofing is necessary because you destroyed the original waterproof layer when you destroyed the tiles.


[Question] Part of the balcony is paved with stone, why crafts and materials are not easy to play loose?


Answer: If you are laying stone on the ground, you usually use ordinary (42.5R) black cement.


[Question] A company is going to use 325# Fengjian Cement. I pointed out that 425# cement is generally used now. He said that 425# cement is too dry and it is easy to break the tiles. Is this statement right? I don't feel right. The material is only getting better and better. The construction is not good. Yang Yan, please explain it, please?


Answer: Cement is not the higher the label, the better, it is to see what construction and then what kind of cement. For example, pouring concrete must use high-grade cement. Tiles can not be used with high-grade tiles to prevent damage to tiles. Above 42.5R cement is called high grade cement.


[Question] What is third-party supervision, how to commission third-party supervision? Is the fee high?


Answer: The Chapter 4 of the “PRC Construction Law” implemented on March 1, 1998 has specifically stipulated specific regulations for construction projects. The supervision shall be an independent third party, and shall not have affiliation with other parties (owners) and Party B (construction units) and material suppliers and other severe relationships. Its responsibilities are to respect facts, provide recommendations and solutions based on facts, objectively, impartially, and independently, and cannot be biased toward any party.
The establishment of quality personnel within an enterprise is an integral part of the internal management mechanism of an enterprise. It is not possible to use the internal quality personnel as supervision. You can sign the {authorization order} and {consignment supervision agreement} by bringing the construction contract and decoration budget form signed with the decoration company to our office. The supervision fee is charged at 3% of the total budget price. (Minimum 1500 yuan).


[Question] The decoration team can request supervision? Even if there is no money, please don't afford a decoration company, so plan to invite the decoration team. Please tell us the relevant knowledge. Also, can the landlord tell us about the taxes and fees that the decoration has to pay?


Answer: If you are looking for a decoration team, you must ask for supervision. Because they have no capital available for protection. Most home improvement disputes therefore arise and are often not resolved. However, their prices are low, and some of the decoration teams do a good job. It's nice to get along with the owners. This depends on what you can do to control them. Please supervise, we have to solve the problem. You do not have to face the decoration team.
The minimum decoration tax in Shenzhen is set according to this: The building area of ​​your home is 0.8 × 300 yuan / square × 5.75%


[Question] Ask what is putty. What is the role of putty?


Answer: PuTTY is a paste-like paint that is used to fill uneven surfaces on objects. It is applied to a primer or applied directly to an object. It is a paste made of extender pigments, coloring pigments, and adhesives. The commonly used putty is made of 108 glue, cooked powder and double fly powder.


[Question] Will emulsified asphalt be waterproof? Is it an environmentally friendly product?


Answer: It cannot be used. Emulsified asphalt is only moisture-proof, not waterproof and extremely environmentally friendly.


[Question] How to identify true and false Dulux 5 in one?


Answer: According to the inspection method stated on the packaging barrel, the items are checked one by one. The products that meet the instructions are genuine products.


[Question] price it? Please supervise me. I don't need to keep guarding in the building.


Answer: You asked the supervisor, of course, not to stay at home every day staring, there is supervision to help you look at it, if there is a quality problem, the supervisor will also have to compensate you for the loss. If your home decoration price (price of decoration team) does not exceed 5W, the supervision fee will be 1,500 yuan. If you have multiple collective supervision with you, the cost will be less.


[Question] The bathroom in my house is also sunken. It is not waterproof yet. It has been filled. Can you please?


Answer: Who gave your home construction? Let him break open for waterproofing.


[Question] My family is upstairs in the decoration of the company, his home was completed on May 20, my family was completed on June 8. On June 10th, we discovered that the water seepage in the building had been damaged and damaged the wall of a house just renovated. Part of the wooden floor was soaked in water. The management office and the management office coordinated and determined the decoration team. The cause of the accident was due to the inhabitants. The decoration team made mistakes in construction, closed the drainage holes, and damaged the waterproof layer. We asked the public engineering team to correct the upstairs and compensate my family for rework losses, and to ensure that the above problems did not occur again, and my family reserved the rights of recourse. The decoration team and the representative of the management office signed the letter and waited until the house decoration team told us on June 20 that we had been rectified and upstairs. We found that the same place had water seepage. We haven’t rectified it and it has been dragged for 20 days. Excuse me, what should I do now? Require the inhabitants to compensate us for all the losses, especially the time lost work. How to calculate?


Answer: If this is what you said, it wouldn’t say that Zhongzhong Company should compensate. As for the compensation, you should ask the Decoration Association to make a loss assessment. As the basis for compensation.


[Question] Hello, what does the baseboard mean?


Answer: The baseboard is a wall covering about 10cm above the ground. Baseboards generally include: cement mortar baseboards, wooden baseboards, ceramic baseboards, metal baseboards, and so on.


[Question] is looking around the cabinet, the cabinet body material is plywood, moisture-proof board and solid wood, etc. In the end that kind of material is good, please give pointers one or two.


Answer: I personally think that the material of cabinets for kitchen cabinets is good for large core boards or splints, but they are expensive.


[Question] What is the procedure, information, and process of the supervisor?


Answer: It is very simple, you find a good decoration team, and then bring their budget quotations and contracts, to our office to appraise the supervision agreement, and then we began to intervene, 2 working days to complete the audit budget and contract rationality, fairness These are no problems before we can start work. In the process of construction, we have 10 inspections, that is, each construction must be signed by the supervision engineer before the construction of the next procedure. Finally, we gave the owner a complete completion acceptance report.


【Question】Recently to start the renovation, I would like to ask the guerrillas. How do you supervise it? I basically do not have carpenters to do, decoration costs are also within the scope of what you said, may I ask the supervisor's duties and the timing of the arrival of the node is like?


Answer: 1. Select the decoration team, 2. Review the renovation contract, quote. 3. Construction management. 4. Assist the owner in process acceptance. 5. Warranty supervision service. You'd better consult us before choosing a decoration team.
In this way, we will understand more profoundly when we communicate face to face. Supervision is a series of services that are provided for the owner during the home improvement process until the start of the post-completion warranty period.


[Question] Thank you for your reply. I still have a problem. What is the best waterproof material for the bedroom?


Answer: Shop wood and laminate flooring are now damp-proofed with damp-proof cotton.


[Question] Where do you work? How to find you?


Answer: The cost of the supervision is based on the decoration quotation of the decoration team. The supervision fee of 5W or less (including 5W) is 1500.5W or more and is charged at 3%. Our office is located at Room 722, Golden Triangle Building, Baishizhou, Nanshan District (upstairs of Shahe Group)
phone


[Question] How to measure the indoor air quality of the interior finish? Who can I ask for?


Answer: After the renovation, indoor air should be tested for compliance. There are four authoritative inspection structures in Shenzhen: 1. Municipal Center for Disease Control and Prevention, Luohu Tianbei Road 25508427 2. City of Building Research Institute of Environmental Pollution Testing Center, Futian Zhenxing Road 8# Design Building 83219255 3. Environmental Testing Center of Organic Material Testing Center, Honggui Road Environment Bureau 25577390 4. Metrology Quality Inspection Institute South Shanxi Liyongzhu Avenue 26941660


[Question] My house has been renovated and it only lasted for a month. Some parts of the bottom of the door frame began to mold, and some white spots grew. It is so ugly. What is the reason? Is there any way to improve this situation?


Answer: Your situation may be that when you do the doorframe, you do not do moisture protection. The correct construction should apply a clean coat of oil on the surface of the frame, and then spread a layer of damp-proof cotton on the wall that contacts the frame. (This is especially true for kitchen and toilet doors).
There is no good way to solve this problem. Only re-do it.


[Question] It is said that there is now a kind of material that can replace putty. The price is almost the same, but the process is much simpler. One of the B&Q's homes is sold. How about the use of such materials? Is it mature? Is there any other choice? Thank you! !


Answer: The material you mentioned is finished putty, also called wall paste. It is characterized by good environmental protection and simple construction. There are more people using such materials and the results are good.


[Question] Today's friends came to visit and found out that the door frame of my house had not been put in damp-proof cotton. I asked the master to say that I had not put damp-proof cotton on the paint. Is it possible to ask Yang prawn to leave dampproof cotton? What if you get mildew at the bottom of the doorframe and grow white spots? My family is at the beach again. Is it necessary to rework! Thank you first!


Answer: In the construction of the door frame, it is necessary to put moisture-proof cotton. It is not enough to make the paint moisture-proof. If there is a wooden cabinet in the same bathroom wall, dampproof cotton should be placed. Your home situation is best to rework.


[Question] In the end, if the bay window is made of marble or artificial stone, it is still a contradiction and there are experts.


Answer: I think it should be better to use marble. This is because artificial stone is generally poor in naturalness and the texture looks unrealistic. Therefore, it is mostly used for cabinets, kitchens, and toilets. Like the window sill, wherever there is an emphasis on decorative effects, artificial stone is rarely used.


[Question] My old house decoration, and the decoration company agreed that in addition to the old tiles 20 yuan / square, brick 30 yuan / square, but after the completion of the new brick, the decoration company told me because of the old brick after the chisel to the uneven wall, for more To do a good waterproof treatment, the company has done a batch of ash on the wall ground, plus 20 yuan per square additional square / square (water-proof costs another calculation), will the decoration company this practice reasonable?


Answer: It should be done. As for the price, I think it is more expensive, generally about 10 yuan more reasonable.


[Question] If a real estate group requires supervision, what is the cost? We are small units.


Answer: The collective supervision of real estate must be more than 8 households. Not according to the size of the apartment, according to the decoration budget (1,200 yuan below 5W, 2.5% above 5W).


[Question] The interface of the lights, switches, etc. has already been set when the room is opened, but we need to change some locations. What should I do? Is it another slot? Moreover, we do not ceiling, so good-looking it? how should I do it? According to the manual fee plus material fee to calculate the total price, tax it? Or is it only a manual fee? We buy materials are tax-inclusive price ah?
If I ask for the decoration team, I will be able to ask the management office to deduct the cost of materials by the total price of 300 yuan/flat. Just pay taxes by hand?


Answer: If you want to change the circuit, then only change the slot and change the line will not affect the appearance. In addition, your decoration tax can't just pay the manual tax as you said, it's the total price.


[Question] Will paving tiles fill with material or cement?


Answer: Of course, the sealant is good.


[Question] Ask the landlord: How can I know if the decoration company has done a moisture treatment? (For example, the closet depends on the bathroom, as well as the door frame). My renovation is almost over. What should I pay attention to when checking? Can you please help us with the acceptance? How much does it cost? Thank you!


Answer: In this way, when you finish the renovation, you are commissioned to give you a final acceptance (according to the acceptance criteria for home decoration projects in Shenzhen). We will give you a project acceptance report. The unqualified items on the report will allow the decoration company to make corrections.
The fee is 500 yuan.


[Question] What is leveling, and I signed a renovation agreement with the decoration company, agreed to refurbish the wood floor 25 yuan / square, Sumu door paint 25 yuan / square, quick renovation finished, the company proposed the above price does not include paint and other materials, need In addition to material money, the above price should be net manual fee or the cost of contracted materials, I should not give, thank you!


Answer: If your original wall is not flat, the wall tiles you posted will not meet the acceptance criteria. So be level. Wood floor renovation includes polishing manual fees of 25 yuan/square almost. Wooden door painting manual fee 25 yuan / square expensive, generally at 18 yuan / square.



[Question] Do you mean that the floor renovation and artificial addition of paint and other materials, a total of 25 yuan / square more reasonable?


Answer: No, the labor cost for floor renovation is RMB 25/sq. But it includes the cost of floor polishing.


[Question] Can a solid wood floor that has been used before be remounted? Because my original room was demolished. There are many wooden floors that can be reused?


Answer: Yes, but be careful when lifting the floor. Once you break the floor, you can't use it.


[Question] The bathroom of the rough house delivered by the real estate developer has been waterproofed, but it needs to change the water in the toilet. Excuse me, if water and electricity are changed, will the waterproofing project be repeated throughout the entire bathroom, or will it be necessary to make up for the changes in the water pipe? In addition, must the kitchen be waterproof?


Answer: If you want to do waterproofing, then do it all. The kitchen must do it. The height of the waterproof wall can be different, the reasonable height is: bathroom to 1.8M, kitchen to 1.5M.


[Question] The cushion decoration company in my family's bathroom is using a mixture of red brick concrete that has been demolished from the wall. It should be construction waste. What are the areas where this is not good? How can I negotiate with them now? Thank you!


Answer: Yes, they use construction waste. This is absolutely not allowed. The National Construction Engineering Regulations clearly stipulate that you let the decoration company rework. If they do not accept it, you can decorate the association's complaint. The use of construction waste as a filler for cushions is not a good place. First, the void ratio between the waste is large, so the storage capacity is small. People walking on the ground will sink the ground and cause the floor tiles to rise and fall. low. Second, the high water absorption rate of garbage will cause water to accumulate in the following year.


[Question] My developer's toilet has been filled up by the developer when it was completed, but how do I know what to fill? Do you need to look aside?


Answer: When the developer is building a house, the quality of the project is borne by the supervision company. The engineering quality supervision station also checks the quality of the project before handing it over to the developer. This method of construction that the national regulations explicitly do not allow is not correct. Yes, if you don't trust the developer, you can check it out.


[Question] 1. The water room is a sinking type. The developer does not have leakage (black waterproof material) for the water-retention experiment. Should it be waterproof? 2. How to do it: Is it necessary to do waterproofing such as Carrier in the above, then spread out what material is flat, make a waterproof layer, and then paste the tiles?


Answer: It is best to do it again. The use of polyurethane waterproof material, Carlisle is one of them. Then close the water for 24 hours to check for leaks. Without problems, do the cushion again, using ceramics as filler for the cushion.


[Question] The decoration company I requested should be a guerrilla, because the company name on the business license is not the same as the name of his company. Is the fee still 500 yuan? Shenzhen home decoration project acceptance criteria where to refer?



Answer: Yes, it is also $500. Standards are on the home page of this Real Estate Information Network.


[question] ask to buy cement and sand, light brick to pay attention to what? What is the general price? Thanks!


Answer: Cement should pay attention to the time from the factory to the time of your purchase can not exceed 3 months (on the packaging bag), Shenzhen is commonly used is "Feng Feng" brand cement. Price: 42.5R16 yuan / package. 32.5R15 yuan/package.
Attention must not be used for sea sand, river sand price: 40/cubic. (Home decoration is generally used in sand) Lightweight brick price: 2.5 yuan / block.


[Question] Where can I buy ceramsite?


Answer: The Nanshan selling ceramics address is at the entrance of Nanshan Avenue opposite the Nanshan Public Security Bureau. The price is 18 to 20 yuan.


[Question] Will the general use of tiles for ceramic tiles is better?


Answer: Generally use 32.5R or 42.5R.


[Question] The size of the washroom in my home is 3.4 square meters, which is about 40 cm. How many bags of ceramsite do you need? How to deal with the ground after laying ceramics?


Answer: Approximately 25 bags, after laying ceramsite, use Zhongsha's shop again to fill the gap between the ceramsites. After the completion, you can hit the bottom of the cement mortar and then paste the tiles.


[Question] The panel of the furniture door is white oak (hollow door). After the master paints the varnish a third time, she finds a dark stripe on the door, which is consistent with the dragon skeleton of the cabinet door. The weather was wet, but I think it may have been caused by glue leaking from the keel. What do you think? How to solve, if the white paint is covered, will the paint fade after a long time?


Answer: It is recommended that you check the quality of the panel. If the panel is too thin, it may make the glue penetrate the surface. You are not in a position to paint or cover it now.


[Question] What is the normal loss of tiles? Toilets and kitchens are waterproof! Listening to Nie Nie said that it is necessary to engage in a protective layer. Do you not know what this protective layer is? Is it cement?


Answer: The normal tile loss should be 5%. After the waterproof is finished, a layer of thin pure grout is used to scrape the layer. On the one hand, it plays a protective role, and on the other hand, it increases the adhesion between the tile and the wall.


[Question] In front of the door you said to put dampproof cotton, so I immediately asked my decoration workers to be in Riga. At first he said that he had to do paint protection. Later I promised to help me in the bathroom door. The door of the other room said that it was not hit by water and there was no need to install it. Is he right? In addition, my small room wardrobe is based on the bathroom. The designer gave me the design to put the wall down and then use the net to put cement mortar. Then do waterproof tiles. However, some people told me that this would not work. There would be no problem in the first year or two. It will not work long enough. Use a red brick to stand up and make a wall. Do waterproof again. Which is better, and do you still need to add damp-proof cotton? Thank you!


Answer: The door of other rooms can be protected from moisture and brushed with varnish. But in the kitchen, the bathroom door must be added. In addition, the rest of the toilet will be cut off (brick). Lightweight brick partition waterproof should be added after the completion of moisture-proof cotton.


[Question] What is the main difference between solid wood and laminate flooring? I think the economy is really a bit, please advise, thank you! !


Answer: Regarding the difference between solid wood floor and composite floor, one: The surface of composite floor is better than real wood floor. Two: The maintenance workload of solid wood flooring is larger than that of composite flooring. Three: No pollution, solid wood flooring is good. Four: The price of solid wood flooring is higher than that of composite flooring.


[Question] "The cost of the supervision is determined according to the decoration quotation of the decoration team. The 5W or less (including 5W) supervision fee is charged at 35% above 1500.5W." How does the "decoration team's decoration quotation" of the above question understand? ? If only the contractor does not include materials, how can the quotation be calculated? Does the cost of plywood, tiles, flooring, furniture, etc. purchased by the owner be counted? For example, the decoration team purse price of 30,000, the final decoration of the cost of 100,000, of which 70,000 is the owner since the purchase of materials, then how to determine the supervision fee 3% of the base?


Answer: Yes, if the decoration team's wages are less than 5W, our supervision fee is 1500. Other owners' own purchase materials need us to go shopping at the store, then charge it at 100 yuan per day. We do not need to purchase, we will also accept the quality of the material purchased at the construction site. No more fees.


[Question] The living room is installed with Dongpeng Tianshan stone tiles. After installing for about 20 days, it is automatically cracked under no external force. It is called the decoration team and Dongpeng technicians. It may be the quality of the bricks. It may also be cracked when the tiles are smashed. Over time, the cement shrinks to crack the surface. Finally, Dongpeng loses bricks and the decoration team re-installs.
In the first two days (three months after the tiling), an empty beer bottle was dropped on the table. As a result, the beer bottle was broken and the floor tile was cracked again. Does it belong to the quality of the floor tiles or the decoration? Or the quality of the floor tile is the same. (There should be no emptying, cement quality should be no problem.)


Answer: If, as you said, there are no empty drums and there is no problem with the quality of the cement, then the quality of the floor tiles themselves is doubtful.


[Question] Does the decoration tax come from the decoration company or the owner? Thank you


Answer: The decoration tax is issued by the owner, and the business tax is issued by the decoration company.


[Question] Can I introduce the main responsibilities of the supervisors to the site?


Answer: The supervision is a series of services for the owners to provide in the home improvement process until the start of the post-completion warranty period. Specific content: 1. Select the decoration team, 2. Review the renovation contract, quote. 3. Construction management. 4. Assist the owner in process acceptance. 5. Warranty supervision service. We generally go to the construction site once an average of 2 days. There is no fixed arrival time. The supervision engineer will vary depending on the construction project. For example, to reform the water and electricity projects, he usually has enough to go twice. Once, he goes to check the waterway and the material of the circuit. Once is the completion of the transformation acceptance signature. For another example, he will at least go 4-5 times for the paint project. He must supervise the construction process in time. Prevention does not follow the specification during the construction process.


[Question] My family's door width is based on Lupin's auspicious numbers. The question is now. I asked two masters. A master said that the width of the door leaf is in line with the Luban ruler number. Another master said that it is correct that the minimum width the door can pass is in line with Luban ruler. I do not know who to listen to now. Anxious to answer. Thank you.


Answer: Generally, the width of the door leaf is made according to the feng shui description on the Luban ruler. For example, 80CM is Ding Caiwang. The netizen's reply: It is estimated that you will not ask anyone about this question. Oh, as far as I know, many people do not even know what Lu Banchi says. After listening to me, I still said that I am superstitious. My home’s approach is based on the actual width of the door, and it’s done in 81cm, in order to leave room for error on both ends.


[Question] Will the kitchen be good for hanging cabinets or ceilings first? Thank you!


Answer: Generally it is to do ceilings and then do cabinets.


[Question] Ask a question: Is there a trabecular beam at the top of each doorframe, if there is no consequence?


Answer: Each door, the upper part of the window should have a trabecular beam, which is called the lintel, and it plays the role of bearing the load on the door and the upper part of the window. Prevent doors and windows from being deformed by excessive weight on the top.


[Question] First, my family has a total area of ​​145 and four bedrooms. I want to build a solid wooden floor with dragons and sand. Among them, the living room and dining room are prepared to be slated for 760*123, and the bedroom is 610*123 wide. Is this not appropriate? Second, shop such a board, construction of any specific requirements will not be a problem? For example, how wide, how long, and how far away will it be for a nine-cent board to guarantee that there will be no buzz in the future? What else have to pay attention to?


Answer: Nothing is wrong, but the marble threshold of the door of the room is used as the boundary between the two kinds of specifications. When paving 9 centimeters (preferably using a fine core board), put 9 centimeters on the cross and wait for all four blocks. Leave 1CM gap between each piece. After the hole is drilled in the ground, the wooden pegs are used, and the pegs are then fastened in the pegs to fix the board and the ground.


[Question] But why do I look at other people's homes and shops, and cut nine-to-six boards to 6-10 centimeters wide, and then the spacing between them is 8-10 centimeters wide, so that it is fixed on the ground? In comparison, will that be a lot worse?


Answer: The floor spacing is too large, and it is easy to produce false effects when walking on the floor. The creaking sound is mostly due to the large spacing of the floor.


[Question] I decided to buy a laminate flooring. What is the price of a better product?


Answer: The price of general laminate flooring is also around 80 yuan. Good is about 130 yuan.


[Question] Picking laminate floors should pay attention to those problems?


Answer: I'll tell you the national standard technical parameters of laminate flooring. You should compare them when you purchase.


Technical indicators Unit national standard Density g/cm3 Large and equal to 0.80 Surface wear-resistant r 6000 Formaldehyde emission mg/100g Class A less than or equal to 9.0 B class more than 9.0-40
Moisture Content % 3-10 Surface Adhesive Strength mpa ≥ 1.00 Surface Corrosion Resistance - Grade 4-5 Surface Resistant to Cigarette Burning - Level 4


[Question] Can wooden flooring be checked individually? how much is the cost?


Answer: The individual project inspection is 500 yuan, for example, water, electricity acceptance, wooden floor inspection and so on. However, this is not worthwhile. It is better to ask us to make a final acceptance after the completion of the project. There is also an acceptance report. Tell you that qualified, that failed. This acceptance only also received 800 yuan.


[Question] What is the general size of the furniture, such as dining tables, children's beds, and desks?


Answer: The height of the table is generally between 700-760. The height of the dining chair is 420-440. The difference between the height of the chair and the table is between 280-320. The length of the children's bed is between 1000-1200, the width is about 650-750, and the height is about 400. The length of the desk is 900-1400, the depth is 500-750, the height of the desk is 700-760, and the clearance from the ground to the desk should not be less than 580.


[Question] When I went to the decoration company to talk about the contract, how did they feel the contract text that I showed me was not regular? Is there any sample of the government contract in this contract? !


Answer: Yes, the contract has a uniform sample. The previous one was: Shenzhen Small-scale Home Decoration Engineering Construction Contract, printed by the Shenzhen Construction Bureau and supervised by the Shenzhen Administration for Industry and Commerce. Now the latest contract (2003 edition): Shenzhen Small Decoration Engineering Construction Contract, jointly prepared by Shenzhen Construction Engineering Cost Management Station and Shenzhen Decoration Industry Association.


[Question] Will the cable and the telephone line be installed in a line pipe?


Answer: Yes.


[Question] There is an item in the quotation of the decoration company I called called the project management fee, which is the total cost of the project *3%. This should be unreasonable, right? This should be a disguised fee for the decoration company. As mentioned in the magazine of the Guild of Supervisors, this kind of supervision is actually false. The so-called supervision personnel are actually the quality inspectors of the decoration company, right?


Answer: Your understanding is correct. The so-called project management fees are unreasonable charges because these costs have been added to the budget of each project sub-item and should not be collected separately. The full-time inspector appointed by the decoration company is actually a quality inspector, but this is misleading to the owner. If the quality of the project conflicts with the interests of the company, the position will naturally be on the side of the company. At this time, the interests of the owner cannot be guaranteed. .


[Question] There is a question that I would like to consult. What are the criteria for hose pressure? Does the country have any rules on this?


Answer: Article 4.2.1 of the national standard (GB50242-2002) has a clear provision. 4.2.1 The water pressure test of the indoor water supply pipe must meet the design requirements. When the design is not specified, the test pressure of the water supply pipe system of various materials is 1.5 times the working pressure, but not less than 0.6 MPa. Inspection method: metal and The composite pipe feed pipe system shall be observed under experimental pressure for 10 minutes. The pressure drop shall not be greater than 0.02 MPa. It shall then be lowered to working pressure for inspection and shall not leak. The plastic pipe water supply system shall be regulated for 1 hour under test pressure, the pressure drop shall not exceed 0.05 MPa, and then it shall be regulated at 1.15 times the working pressure for 2 hours. The pressure drop shall not exceed 0.03 MPa, and at the same time, check that the joints are not leaking. .


[Question] My bathroom is sinking. The developer has to do waterproofing, but I use the grey bricks and mud sands of the wall to break it and mix it with yellow sand (the red bricks have been singled out) , pour a lot of water and fill it with Feng 325 # cement leveling, and then do Sika and Carlisle. Is it useless to do this? Is it necessary to rework? Thank you!


Answer: If all are scrapped and backfilled, there is no need to rework.


[Question] The bathroom in my house is sinking and the ceiling is relatively low, so I don't want to ceiling. What should I do with my bathroom ceiling? I heard that the method of painting with ordinary paint will soon be steamed out. The designer said that it can use exterior paint. Is that right?


Answer: It is feasible to use exterior wall paint.


[Question] I would like to ask about the difference between the cost of wood painting and the labor cost of painting. Is it reasonable for a decoration company to spray paint manually at 30 yuan/square? In general, how much is the company's labor fee for painting and painting?


Answer: Under normal circumstances, the company's quotations for renovation companies offer labor costs of 18 yuan per square meter, and the labor costs for painting are around 25 yuan per square meter.


[Question] 1. In the past, the first step of painting was to brush the foam water to seal it. Does this have any effect on quality? 2. In addition to the first anti-rust paint on the outdoor iron door (courtyard door), what methods or what kind of surface paint is used to prevent rust? 3. My furniture wants to use ash to make the panel and spray the white light paint to see the grain of the wood. Is it thinner when scraping putty?


Answer: First, the use of foaming water is an old practice. The paint is now under the primer, so it has no effect on the quality of the paint. Second, the family's surface should be rust-proof, or the effect of brush antirust paint is good. Third, the method of scraping putty is very troublesome, of course, to adjust the thin. Another method is to adjust the bottom of the water slurry. This method is more convenient.


[Question] How many outlets in the kitchen are appropriate?


Answer: The number of sockets in the kitchen is appropriate. It depends on how much of the appliances in the kitchen. In general, the appliances in the kitchen are: Disinfection cupboards, refrigerators, microwave ovens, range hoods, rice cookers. If only these appliances are available, generally 4 - 5 outlets are sufficient.


[Question] My house was soon renovated, but I found that there were empty drums in some parts of the wall. The decoration company said that emptying was a time for civil engineering. When we approved the wall, we asked the project manager to check for us. He said at the time. Did not empty, and now this happens, whether the decoration company should be responsible? In addition, the decoration contract was agreed to be completed in the end of last month, but there is no specific amount of compensation overdue. Can I still ask for compensation?


Answer: First of all, to be sure, in the end is empty. Second, when the project manager checked the quality of the original room, there was no written record? If the duration exceeds the time specified in the contract, compensation may be required. Each member unit had a convention in 2001, and the contract for the duration of the project did not specify how much compensation should be paid per one thousandth of a day.


【提问】谢谢楼主的答复,现在有三处都是在窗户边装修公司找平的地方空鼓,一飘窗大理石下也出现了空鼓(装修公司说没有办法解决了),挨着找平的墙旁边的墙角也出现了空鼓,我怀疑是连带作用造成的。项目经理那里没有文字记录,只是口头答复。请问我现在应该怎么办?


回答:你现在可以要求他们返工,因为他们的铺贴质量肯定有问题。如果他们不整修,你就去装饰协会投诉。


【提问】1.卫生间地面在铺瓷片前需要找平,装修队除了收取铺瓷片的费用外还得算上找平的钱(18元/平米),请问扬飙,这样收费是否合理? 2.做电视背景墙的电路改造要另外算电路改造费用吗?


回答:你家的卫生间地面如果高低差很多,是需要找平的,找平18元/平方合理。 电视背景墙的电路改造不能另外单独收取费用,因为全屋水电改造的费用已经包含了这些。


【提问】我家想装太阳能热水器,(从外墙走明管的)昨天装修公司安水管的时候,发现与煤气管道贴的很近。大概它们之间的距离有2~3公分,装修公司说没关系的,我心里总觉的不对,不知道有没这方面的规定,盼复!先谢!


回答:如果是热水管,与煤气管的交叉净距必须是10CM以上。冷水管与煤气管的交叉净距为2CM以上。


【提问】我明白了,可是热水管没办法和煤气管错开10CM,请问有没其他的办法解决?


回答:你可以在热水管的外面加隔热石棉套管的方法来处理。不过采取什么样的方法你都应该让煤气公司的人来看过,征求他们的意见。


【提问】定了足1.2的防盗门,有什么方法可以检验究竟是不是1.2的啊。


回答:你可以检查产品出厂合格证和产品质量检测报告。另外检测的方法可以用游标卡尺量门的厚度是否达到1.2.另一种方式是用力按压门板,1.2的和1.0的强度感觉就是不一样。


【提问】请问卫生间跟厨房用塑钢门好,还是不锈钢门好?用木门家玻璃可以吗?


回答:是不锈钢门好,可是价格高,一般家庭的卫生间门用塑刚门,最好别用木门,因为卫生间经常有水气,木门容易受潮发霉。厨房间门可以用木门加玻璃的推拉门。


【提问】我买的是二手房,原来墙面已经刷好了乳胶漆。但不是很好。我请装修公司重新做过,给我的报价是19元每平米。我觉得应该把原来的墙面铲掉再重新做。可是装修公司只同意铲侧面墙,不肯铲天花板。还要求加1元每平米。请教一下如果不铲的话会不会用一段时间就出现质量问题?而且说好是三面底三面漆,可没有人当场看着,做完后怎么才能判断他有没有偷工减料啊?谢谢!
另外,我找的是雅庭装饰公司。装修合同未列明超过工期如何赔偿,那么如果他延误了工期,我是否可以要求赔偿?


回答:旧房改造,墙面及天花都应该铲除原面层,这样才能保证质量,保证使用期。 有没偷工减料,要看刷的油漆数量是否和面积相符合,一般来说一桶5L的面漆可以刷到不超过50平方,你可以自己算算,如果不清楚用了多少数量,那就看油漆完的质量是否达到标准。(涂料表面应颜色一致,不得有掉粉,起皮,透底,漏刷,泛碱,收色,
流坠,疙瘩现象) 如果是装修公司的原因造成工期拖延,合同没注明赔偿价格的,按工程款的千分之一/每日进行赔偿。


【提问】非常感谢您对我家出现的装修质量问题所给的意见和建议。现在装修公司已经给出现空鼓的墙壁修补好,并且说这两天即可交楼给我了,由于我家现在的居住条件不好所以我也很想早点搬进新居。但是墙壁修补过还不到一个星期的时间,我担心过不了多久又会出现裂缝,请问我现在能不能验收?验收的时候应该注意些什么呢?


回答:你最好是再等几天验收,一般有个15天左右验收比较好。到时候验收你可以让我们的监理工程师去帮你,你只要负责车费就OK了。


【提问】什么叫空鼓?


回答:空鼓就是指基层与面层由于施工方法,使用材料不当所产生的分离。


【提问】请教一下防水问题,我家装修公司用达尼尔801做防水,装修公司说是水剂材料,不是聚氨酯材料。不懂,请教你


回答:达尼尔801(DANIER)是有机硅防水改质剂,属于聚合物类防水材料。不属于聚胺脂类防水材料。


【提问】1.关于打压,你说“金属及复合管给水管道系统在实验压力下观测10分钟,压力降不应大于0.02MPa,然后降到工作压力进行检查,应不渗不漏。塑料管给水系统应在试验压力下稳压1小时,压力降不得超过0.05MPa,然后在工作压力的1.15倍状态下稳压2小时,压力降不得超过0.03MPa,同时检查各连接处不得渗漏。”
那请问我的PPR管,打压时间十几分钟,压力12公斤,是不是就算可以了? 由于打压时我不在场, 也想再请教一下您,有没有打压打到12公斤的? 2.施工队在打掉门框的副梁时把与其垂直相交的墙面(也是门框上)打出了一条不浅的裂缝,请问有没有危险,应如何处理?


回答:PPR管的试压应该这样的,打压十几分钟,压力为6公斤,我们一般打到8公斤就足够了。没有打到12公斤的。 要在门框上做加固处理。(可以用木方料,预制钢筋混凝土过梁,加钢筋)等方法处理。


【提问】防水是否应刷三遍,我卫生间上面有一阁楼。谢谢!


回答:你家用的是什么类型的防水材料? ?还有那些部位刷的防水?


【提问】达尼尔801(DANIER)是有机硅防水改质剂,属于聚合物类防水材料。不属于聚胺脂类防水材料。谢谢你! 再请教:这种材料好不好?装修公司说卫生间地板刷二遍,墙一遍(1.8M高)。厨房地板刷二遍,墙一遍(0.3M高)。这样对不对?谢谢!


回答:这种材料效果还可以,不管是卫生间还是厨房,地面都应该做三道工序,墙面为二道。高度建议:卫生间为1.8M,厨房为1.2M.


【提问】本人打算10月份装修,但想现在把厨卫的防水先做了,因现在楼上楼下正在装修,检查起来比较方便,不知到时装修贴瓷砖是否有影响。先谢谢了!


回答:你的这个方法可行,不过有一点,防水作好后一定要做闭水24小时试验,没问题后就可以放到10月再贴瓷片,到时候对贴瓷片没啥影响。


【提问】装修公司让我们后天验收,说是万一在补墙的地方再出现裂缝的话,他们可以随时来解决。您说这样可以吗?我也是真的想早一点住进去的。如果可以的话,在验收时我们应该做些什么来保障自己的权益呢?


回答:可以的,在验收的时候让他们准备一份验收报告,还有一份事情的经过和今后出现问题怎么解决的书面承诺。(要有公司盖的章)。你要留一份。


【提问】装修公司一般要收取30%的费用,那找装修公司不是太亏了吗?


回答:这个问题就要看你怎么理解了,装修公司有自己的营运成本,当然价格高,但是出了问题有保障。所以说亏与不亏只是相对的,你自己看后选择吧。


【提问】我的房子7月2日完工了,可才过了一星期就发现墙面有几处掉皮,这是怎么回事?是不是和刷墙那段时间总是下雨有关?我用的是多伦斯涂料,刷墙的师傅刚开始时说,底漆要加一些水,被我坚决制止了,会不会是他偷偷地掺了水导致?那现在该怎样的补救?


回答:这和兑水没关系,应该是在施工的时候,头遍漆没干透就接着上第二遍漆,再加上施工的时候天气潮湿。墙面的水份全聚集了,现在天气一干燥,墙面的水份一散发,就会产生收缩,掉皮,起皮的现象由此产生。


【提问】我刚交了定金,还没出图,是否能退?


回答:可以退!


【提问】107,108,菜胶和白乳胶那一种更环保呢?


回答:107胶已经禁止使用了,现在常用的都是108胶。菜胶和白乳胶相比,一般用白乳胶要好的多。


【提问】请问用涂料处理做电视背景合适吗?效果怎样?有什么要特别注意的?有没好的涂料公司介绍?


回答:可以的,不过效果则要看设计师设计的整体方案是否恰当。


【提问】我买的是二手楼,墙面据说是去年才刷的,整体看来还是比较完新,但是局部有发霉部分。因为袋中米米较少,所以我打算只铲除有问题部分。请问这样做对以后刷完漆后墙面的整体颜色是否会一致?还有这样做质量是否会问题?


回答:你的这种做法是可以的,但是如果只刷修补部分的漆,会与原来的墙面漆有色差。我建议你在做修补部分墙面漆的同时,也把原墙面重新刷二遍面漆。


【提问】我买了豪方悠然居的房子,在路边,发展商只肯用6mm的玻璃,不肯改为8mm,更别说中空隔音玻璃了。在样板房的室内关窗情况下,环保局的检测站的数据:夜间38.4-50.1dB.是否符合相关的标准?


回答:《民用建筑隔声设计规范》GBJ118-88 3.1.1 住宅内卧室,书房与起居室的允许噪声级,应符合以下规定: 室内允许噪声级(A声级,dB) 一级二级三级卧室,书房(或卧室兼起居室) 小于等于40 小于等于45 小于等于50 起居室小于等于45 ( 等于小于50 )


【提问】本人打算在小房做“塌塌米”,中间做抽屉,请问“塌塌米”有那些基本要求,要注意什么?面扳如何处理?


回答:要注意木框架制作的方法和材料就行了,一般来说是用木方料或者15厘大芯板开条做底架,底架上面再铺一层18厘大芯板就OK了。面板直接铺在大芯板上即可。


【提问】今天进场,装修队长提出要将我的房子所有的墙面全部重做,房子是2001建的毛坯房,原开发商刷了一层石灰,现在再重做,合不合理?


回答:旧房改造,应该把原墙面的粉刷层铲除,重新刮腻子打底,刷乳胶漆这样才能保证装修的质量,建议你别去省这方面的银子。


【提问】是不是做家私比较好赚,装修队一听到我订做家私好象立刻热情就低很多


回答:一个是水电改造,另一个就是做家私,这俩项是最赚钱的,你不给人家钱挣,人家当然没热情了。


【提问】我家的墙已经快刷完了,可我发现约200平米的墙只用了一桶5L的多乐士配得丽漆,这应该属于偷工建料吧?我可以要求他重新刷吗?另外大衣柜的门缝宽度是否有一定的标准?我觉得我家衣柜的缝隙太大了有些地方都有3毫米宽。谢谢!


回答:是的,如果200平方才用了5L.肯定是偷工减料了。你完全可以要求他重新返工。另外衣柜的门扇与门框的留缝宽度为1.5-2.5MM.


【提问】12厘的板中是不是有实际11厘厚的情况?板材的厚度是不是根据厚度严格的划分的?


回答:你说的没错。


【提问】我的装修合同上对工程量的增加减少还有规定。请问这规定合理吗?


回答:2003年版的深圳市小型装饰装修工程施工合同上有明确规定。 第6.9条甲方不得随意取消合同承包内容的施工项目,若取消的施工项目造价超过合同预算总价的25%时,需征得乙方同意,并向乙方支付取消该项目的预期利润,
本工程预测利润率为%


【提问】《民用建筑隔声设计规范》GBJ118-88 3.1.1 住宅内卧室,书房与起居室的允许噪声级,应符合以下规定: 室内允许噪声级(A声级,dB) 一级二级三级卧室,书房(或卧室兼起居室) 小于等于40 小于等于45 小于等于50 起居室小于等于45 ( 等于小于50 ) 有下列疑问,1)我买的是滨河路的旁边的房子,据发展商说他们测过高峰期的时候是对正在紧张施工、未装门窗、无任何降噪设施抽样进行实测,北面平均噪音为60~75分贝(中午12:00,下午6:00白天交通繁忙时)。对于已经装修好的房子噪音比毛坯房小约5分贝。大综艺曾委托是环保局在五层的样板房里实测,结果表明噪音影响很小,符合国家标准。这种说法成立吗,是你错了,还是他们在糊弄我们。
2)到底是关起窗户测还是打开窗户测。有规定的时间段吗?(譬如是晚上8点以后)还是指全天的噪音量的幅度。3)我咨询过发展商,发展商说,因为滨河路不是他们管得了的。他们不是噪音源。因此无法保证噪音在标准范围内,这个说法过得去吗?4)如果噪音超标,我们可以徇什么途径投诉,还是索赔?麻烦您解答一下。


回答:是这样的:我所列出的标准是房屋设计时的规范标准,你家在路边,属于4类噪声区,规定白天是开窗不超过70分贝,晚上不超过55分贝。关窗比不关窗要低10分贝,比如白天关窗测应该不超过60分贝。晚上不超过45分贝。检测没有规定的时间段,只分昼间与夜晚。
如果你要投诉,可以去建设局信访办。


网友回答:在没噪声源的情况下,应符合设计规范的噪声值。在有噪声源的情况下,按噪声源的种类不同划分噪声区,每种噪声区的规定不一样。象你家的这种就属于4类噪声区。


【提问】我家的立式洗手盆安装好后,现在有松动,原来师傅用白水泥末了一遍,没有打钉子固定,有什磨办法能让洗手盆稳固点?


回答:你可以试试用凝石胶,大概15元/1组。效果应该不错。


【提问】我家师傅说防火板上的白色漆时间长了就会起泡? (衣柜)说用手刷漆比较好些。说这样就不会起泡,时间长了如果不喜欢那颜色的话还可以再换,但如果是防火板的话则不可以。我在好百年看中的颜色,是防火板的效果,也就是不是光面的。请问他们说的对吗?如果是的话,还有什么方法可以做成防火板的那种不光滑(哑面)效果。特急! ! ! ! !


回答:你家师傅说的没错。但要想做成你需要的效果,还是只有用防火板做,但是在贴的时候不能用利时得胶,改用高标号的白乳胶。这样才不会起皮,剥落。


【提问】下沉式卫生间的地面若已被发展商填平,我想移动抽水马桶的下水位置,且能保证将来不会发生堵塞,有何办法?多谢!


回答:最好不要去改动下水管道。


【提问】我家装修入住有半年了,最近发现一个卫生间的墙砖出现裂缝,砖是30*50的,有一块裂缝完全暴露出来,贯穿上下,另外的砖仔细看,可以发现绝大多数均出现不同程度的隐含的线。可以预见时间长后就会裂开,另外一个卫生间是另外一个牌子的没有一块有这种现象。在当时铺砖的时候有问题的这个卫生间的墙砖出现过多块空鼓的现象,有的返工过,其他的一些因为当时有个朋友说问题不大,而且返工效果可能更差,所以没有全部换。当时泥工自己也不清楚为什么有这么多空鼓,说可能是防水的沥青太厚了。另外的一个则没有这种情况。
请分析一下这是砖的问题还是泥工的技术引起的?非常感谢!


回答:你的这个问题我遇见过,当时分析原因是911兑了天拿水,而且911没干就贴瓷片,结果是大面积空鼓,甚至有些都剥落了。 出现裂缝的情况有俩种原因,一是砖的本身质量有问题。二是在贴的时候砖泡水时间不够,还有就是贴砖用的水泥标号太高。


【提问】防水即将开始,装修公司建议卫生间靠外的墙不用防水,说即使有水渗进来,那是房地产的事!是这样吗?


回答:一般情况下是卫生间的内墙要做防水处理。外面的墙如果靠墙部位有木制作的,要用防潮棉做防潮处理。


【提问】请问高标号的白乳胶具体是指什末标号的呢?贴磁砖的水泥标号太高可能会造成瓷砖裂缝,那什末标号的水泥算太高,算合适呢?


回答:白乳胶的标号是按粘稠度分的,你在包装桶上可以看到的,一般1000以上为高标号,1000以下为普通标号。贴瓷片的水泥不能用太高标号,一般也就用32.5R或者42.5R,42.5R以上的水泥就不能用了。


【提问】《建筑装饰装修工程质量验收规范》(GB50210~2001)、《住宅装饰装修工程施工规范》(GB50327-2001)和深圳市建设局《深圳市家庭装饰装修工程质量验收标准》
这几个标准那里可以找得到。


回答:油工:《建筑装饰装修工程质量验收规范》(GB50210-2001)、《住宅装饰装修工程施工规范》(GB50327-2001)这2本可以在建筑书店买到。
深圳市建设局《深圳市家庭装饰装修工程质量验收标准》我这里有,你要可以来我这复印给你。


【提问】请问衣柜门是实心。还是空心,具体做法如何,谢谢!


回答:衣柜门的做法是先用9厘夹板做双面开槽的横条,横条的间距不超过15CM.然后双面贴3厘夹板,重物压5天后,再贴3厘饰面板。


【提问】另外装修公司的管理费是否属合理收费?我的两室一厅现在已超出预算,原来预算5~6万,现在7万都不知能否打得住,公司原来对辅助用料的估算太低,仅2000元,现在光买水泥沙就不止2000元,我只推了一面墙,19平米,现买了50包水泥,还有其他工具,包括刀片、口罩、刷子、桶、铁楸……都得自己买,据他称为清包工,不知是否合理?还有,他帮我买的防水涂料将近1100元,德高牌,据说阳台厨房都涂了防水,请问是否一点必要都没有?


回答:装修公司所收取的管理费是不合理的,另外工程的辅料在深圳是包含在预算内的,我不知道广州装修公司的预算报价是怎么列的,所以也就不好说。 内阳台一般不需要做防水,外阳台才做,厨房要做防水的。德高的材料费每平方大概是15元/平方(通用性)。23元/平方(柔韧性)。


【提问】廚房的水龍頭有什么特別要求嗎?我家是兩個衛生間﹑一個廚房和一個生活陽台﹐這大概需要几個水龍頭?另發現客廳的地面與陽台的地面齊平﹐與陽台的導軌一樣高﹐這樣一貼磁磚﹐那不是就比導軌高了嗎?需要處理一下嗎。
門與室內的地面呈什么樣子﹐是高于室內地面﹐還是低于。


回答:厨房的水龙头用的时候比较多,所以建议你用质量好点的,至于要用多少个水龙头,这要看你卫生间,阳台,厨房里配置而定的。 你的阳台门是已经装好了的还是没装好的?如果是已经装了的,肯定要处理,可以门里外铺贴大理石门坎。另外室内的地面要比阳台的地面高些,防止阳台地面的水倒流到室内。


【提问】 花和尚大师曾就橱柜常见的几种板材做过分析: 按防潮性能排:(1)防潮板(2)夹板(3)大芯板按强度耐用强度排:(1)夹板(2)大芯板(3)防潮板按可能变形机率大小排:(1)大芯板(2)夹板(3)防潮板我想问的是:通常说的烤漆橱柜只是烤了面板吗?我觉得生活中厨房的潮湿主要来自做饭菜时的高温蒸汽。面板贴防火板,时间一长会起皮吗?如果用大芯板做柜身,面板双面烤漆,防潮性如何?在日常生活使用中,大芯板做柜身的橱柜容易变形吗?


回答:烤漆不是只烤面板,而是如成型的柜门这样整个烤的。面贴防火板时间长了是要起皮的。如果用大芯板做柜身,面板双面烤漆,防潮性还可以,但是不如用防潮板直接做的。大芯板做柜身的橱柜相对来说是比较容易变形。


【提问】我还有两个问题要请教:1、看着几种板材的剖面,觉得用防潮板做柜身好象不够结实,实际应用中时间长了没问题吧?2、我徘徊在面板用防火板还是用烤漆中,防火板优点不少,只是我觉得如果贴的工艺不好,封得不严实那就惨了。烤漆漂亮,但怕碰撞。请问:现在做橱柜的厂家那么多,压贴面板、做封边的工艺跟设备的关系大妈?名牌橱柜的设备好做工好,那市面上那些小品牌呢?还有:时间长了烤漆的色泽变化大吗?


回答:1,用防潮板做的厨柜应该没问题,至少到现在为止我们还没接到防潮板的投诉。2,确实是和设备有很大的关系,一般高档名牌的设备要先进的多。小品牌的厨柜我了解的不多,记不住名字,抱歉。3,时间长了烤漆的色泽当然会有所变化,不同的是工艺好的时间长久些。


【提问】再请问凝石胶那里有卖?会不会发霉? Thank you.


回答:乐安居就有卖的,不会发霉。


【提问】请问楼主,大师,我家装修,楼下已经入伙2年了,还需要做漏水测试么?


回答:一定要做。


【提问】如果是装修公司自己监理,报价是不是任由他们报了?请专门的监理如何付费?


回答:装修公司的报价是按照他们公司自己定的一个价格报的,每个公司的报价都不相同。他们的监理费不管你愿意不愿意,都单独列出来放在报价里。 如果是请我们第三方监理,费用是按照你与装修公司的报价而定的,5W(含5W)
以下为1500元,5W以上按3%收取。


【提问】我联系居众,他们的报价每项都包含装修税了,所以最后的

800W 140mm Circular Saw

The 800W Circular Saw is Perfect for Cutting Wood, especially on Bevel Cutting and Straight Cutting, compared to the Jig Saw.

It is a wood cutting power tools that users feels much better, compared to jig saw.

The Wood Working Power Saw with single speed 4000rpm, Bevel Cutting 45°, 45mm cutting depth at 90 Degree.

The 140mm Circular Saw With a dust blower for max cut -line visibility.

The Electric Wood Cutting Power Tools with protection button for your safety, soft rubber handle for comfortable use.

800W 140Mm Circular Saw,Circular Saw 800W,Electric Circular Saw For Wood,140mm 800w Circular Saw With Electronic Brake

Ningbo Brace Power Tools Co., Ltd , https://www.cnbrace.com