>>> Links: Experts Weapons: Clever Arrangement of Renovation Process Renovation timeline accurately grasp Renovation is a time-consuming and laborious process. From the start of design to the completion of the construction, several processes are required. Carpenters, electricians, hydraulics, bricklayers, oilers, and other types of work are in a certain order. Winter's influence on processes is mainly for hydraulics and oils. The impact of work. A home improvement project usually takes 45 to 60 days. It takes about ten days to install cabinets, floors, sanitary ware, and furniture. It takes at least 55 days from the start of the renovation to reach the home environment where you can stay. Ventilation for a month takes approximately 85 days. From now until the Spring Festival, there are only 86 days. Therefore, experts from the supervision company remind you that for the owners who want to stay in the new house before the Spring Festival, they must start preparing for the renovation. Special habits save money and save trouble The home furnishing industry has a special sales habit - after the end of the year, the annual impulse is calculated as the sales amount before December 31 of each year is included in the current year's sales volume. Manufacturers will use this amount to carry out rebates, even if the main material for final sales is installed after the year. Does not affect the manufacturer's rebate point for agents. Therefore, in order to get more rebates from the manufacturers, many brand agents do not hesitate to use their expected returns to give back to consumers, which results in the lowest prices for home building materials at the end of the year. This year's phenomenon is even more obvious, and the time is also a lot earlier than in previous years. The reporter saw on homes in Ginza, Home Furnishings, and Oriental Homes on Saturdays that many brands played at the end of the year. La Bao. At this time, if consumers take the time to purchase building materials and household goods, they can achieve the purpose of saving money and saving time. Reserve the delivery date of the main material The purchase of building materials, household products and furniture is different from daily consumer goods. These products have a product delivery period. Therefore, after the owner selects a good model, the main material merchant will send staff to the home owner to measure the size, and then give the manufacturer orders to produce. The finished product is sent by the manufacturer after the production is completed, and finally the main material supplier is installed in the owner's home. Different main materials have different stocking periods. The wooden doors and door pockets generally take 40 days for the delivery period. Cabinets generally take 30 days, and solid wood floors take about 7 days. It takes approximately 15 days for furniture to be used in homes and 30 days or more for special sizes. Therefore, if homeowners need to use building materials for household products, they should reserve time for delivery to the sellers. This requires the owners to make overall plans to go hand in hand at the beginning of the renovation. The wish to live in a new house before the Spring Festival. Entrance decoration children's room decoration home home decoration furniture new door price home cabinet cupboard door home improvement home decoration home
Characteristics and Advantages
(1) Intelligent control design: adjustable main parameter and secondary parameter automatically according to the weight of door leaves;
(2) Low noise: Special static sound track, integration of motor, worm-gear and retarder.
(3) Anti-clamping function: automatically reverse when meeting barriers;
(4) Unique electronic motor lock: the motor will lock up when the door is forced to open.(controlled by remote or switch)
(5) Tighten force: seal door when closed, power consumption approximately 10W under standby;
(6) Advanced brushless motor(36V,100W) can automatically adopt different heavy door leaves;
(7) Bi-doors inter-locking: one of the door leaves always remains closing;
(8)Safety sensor terminal: sensor stops working when door closed;
(9)Unique coating technology: never rusty;
(10)Easy and convenient to install;
(11)Working Process: when the door leaf closes to the right place, the door leaf will slightly shift to the door frame and the ground. The rubbers on the four sides of the door leaf will completely combine with door frame and ground, which ensures air tightness. When the door is open, the rubbers will separate from door frame and ground, which avoids contraction on the ground.
Technical Specification
Specification
Light Duty
Heavy Duty
Rang of the Door
Single-Leaf
Double-Leaf
Single-Leaf
Double-Leaf
Door leaf max weight
100kg
100kg x 2
200kg
200kg x 2
Mounting Method
Surface mounting or built-in mounting
Open Width
700-2000mm
650-2000mm
750-2000mm
650-2000mm
Power Supply
AC 220v ± 10%, 50-60 Hz
Opening Speed
300-500mm/s (adjustable)
Closing Speed
250-550mm/s (adjustable)
Creep speed
30-100mm/s (adjustable)
Hold-open time
0.5-20s (adjustable)
Airproof Force (Max.)
>70N
Manual Pushing Force
<100N
Electronic Lock Force
>800N
Power consumption
150W
Ambient temperature
-20+50 C
Technical Details:
(1) Rubber lining sealing technology combined with V groove on the guide rail enables the door completely sealed when the door closed;
(2)Special door body location technology. Semicircular surface beam on the ground matches with the V style groove at the bottom of door leaf, which stop the door from swing and make sure it moves stable and smooth;
(3) The door body decorated with matte stainless steel or spray surface, and on the middle and both sides with sealing stripes to ensure the hermetic effect.
(4)Feet sensor switch applied to avoid contagion;
Stainless Steel Sliding Door,Stainless Steel Bypass Sliding Door,Stainless Steel Interior Sliding Door,Stainless Steel Folding Sliding Door Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.spiralfastdoor.com
Want to stay in the new house before the Spring Festival