Recently, the "Three-Year Action Plan for Comprehensive Improvement of Open-pit Mines in Henan Province (2018-2020)" (referred to as "Program") was introduced. Henan proposed to use three years to coordinate the promotion of environmental protection and safety development of open pit mines and effectively guarantee the rigid demand of mineral resources. By the end of 2020, all open-pit mines in the province have reached the standards for green mine construction. New open-pit mines are prohibited within the scope of rectification, and open-pit mines have been fully withdrawn. I. Renovation of key areas The key areas specified in the “Programme†mainly include three parts: (1) The scope of the ecological protection red line delineated by Henan Province; For the area within the red line of ecological protection, new open-pit mine projects are prohibited, and open-pit mines have been fully withdrawn; (2) Zhengzhou (including Gongyi City), Kaifeng (including Lankao County), Luoyang, Anyang 10 counties under the jurisdiction of Huaxian County, Hebi, Xinxiang (including Changchun County), Jiaozuo, Fuyang, Sanmenxia and Jiyuan City; For key areas of air pollution prevention and control, new open pit mine projects are prohibited in principle; (3) Notice of the Henan Provincial Development and Reform Commission on Printing and Distributing the Negative List of Industrial Access to Eight Key Ecological Functional Zones in Lushi County (Trial) (Yufa Reform Planning [2018] No. 436) to determine the national key ecological functional zones 8 counties (districts) including Lushi County, Xixia County, Neixiang County, Luanchuan County, Tongbai County, Xinyang City, Luohe County, and Guangshan County. For the national key ecological function zones, new construction, expansion and open pit mines are strictly implemented in accordance with the negative list specified in the Yufa Reform Planning [2018] No. 436 (details can be found at http:// Ar/20180625000004.htm download it yourself). Second, the main task (excerpt) (1) Find out the status quo Comprehensively ascertain the status of development and utilization, environmental protection, and safe production of open pit mines in Henan Province, and the loss of open pit mines and mining waste rock slags by responsible persons, and statistical analysis of each item by item, and formulate a remediation plan according to the requirements of “one mine and one policyâ€. Carry out inventory management and account management. Completion time limit: before the end of 2018. (2) Discontinuation and rectification The licenses are complete, but the mines, environmental protection and other relevant laws and regulations, policies and systems, management requirements and related programs are not designed and implemented to implement mining, treatment and protection. In particular, open-pit mines with unregulated pollution control and emission standards are not subject to immediate shutdown. Remediation. The open-pit mines that have been discontinued and rectified should be formulated according to the requirements of “one mine and one policy†to complete the specific production and remediation plan, and complete the remediation tasks in time according to the plan. The mines that have been rectified and completed can be resumed after being accepted by the local government. During the remediation period, the open-pit mines that have applied for closure will be required to cancel the relevant licenses, dismantle the production equipment and facilities, and organize the implementation of ecological restoration. Open-pit mines that refuse to stop production or resume production without authorization shall be forcibly closed according to law. If ecological damage is caused, the responsibility for compensation for damage to the ecological environment shall be investigated according to law. Completion time limit: The list and remediation standards will be announced before the end of January 2019. Complete the remediation work by the end of December 2020. (3) Banned off For illegal open-pit mining mines (mines with expired licenses), the local government immediately bans them according to the standards of “three no-stay†(no personnel, no mining equipment, no buildings). If the license is not complete, or the license is complete, but within the prescribed time limit, the mine that fails to meet the standard and fails to pass the inspection shall be closed by the local government organization, and the relevant license shall be cancelled or revoked in time, and announced to the public. Time limit for completion: Banning work will be completed by the end of December 2019. Close the work by the end of December 2020. (4) Ecological restoration Open-pit mines should increase the environmental protection and ecological restoration of mines in accordance with the principle of “who mines, who protects, while mining, and governanceâ€. According to the standards of green mine construction, environmental impact assessment reports, geological environment protection and land reclamation Design content and approval requirements such as the program and soil and water conservation plan, earnestly carry out ecological restoration, and strive to restore green mountains and green mountains. In the open pit mines with active withdrawal or policy mandatory closure, in accordance with the principle of “who destroys and who governsâ€, it is ordered to fulfill the obligation of ecological environment governance restoration within a time limit. Completion time limit: before the end of 2020. Third, policy measures (1) Strict access to open pit mines. It is forbidden to build new small-scale open-pit mine projects for ordinary building materials and minerals, strictly limit the construction of small-scale open-pit mine projects for non-general construction of stone materials, and completely stop the construction of new open-pit mine projects with sporadic dispersion. The newly-built building stone mines must have a reserve of more than 10 million tons, and the annual mining scale must reach more than 1 million tons. The new building (finished) stone mines must have a reserve of more than 2 million cubic meters, and the annual mining scale must reach 100,000 cubic meters / year or more. (2) Encourage voluntary exit. For the open-pit mines that the enterprises have applied for to close and exit before the end of December 2018, after the local government has passed the inspection and acceptance, the mining rights will be refunded in proportion to the remaining reserves of the remaining resources, and appropriate compensation will be given; For the open-pit mines that enterprises have applied for to close and exit before the end of December 2019, after the local government has passed the inspection and acceptance, the proceeds or the price of the mining rights will be refunded according to the proportion; no compensation will be paid; For open pit mines that are forcibly closed due to rectification and acceptance, and open pit mines that are forcibly closed due to violations of laws and regulations, the proceeds or prices of mining rights will not be refunded and will not be compensated. (3) Accelerate the upgrading and upgrading of mines. Close down a number of mines and supporting processing and production enterprises with outstanding environmental problems, low resource utilization rate and poor economic efficiency, and cultivate a number of new mining enterprises with environmental protection in place, high resource utilization rate and outstanding comprehensive benefits, and strengthen the mining industry of our province. Competitiveness. In accordance with the principle of “government guidance, enterprise construction, benchmarking, and information disclosureâ€, the main responsibility of the main construction of mining enterprises shall be compacted. New open-pit mines must be constructed and operated in accordance with green mine construction standards. Open-pit mines must be upgraded in accordance with green mine construction standards. Governments at all levels should strengthen supervision and inspection of green mine construction, and entrust a third party to conduct on-site verification and evaluation in the form of government procurement services. Manual Sanitary Butterfly Valve Manual Sanitary Butterfly Valve,Clamp Butterfly Valve,Manual Butterfly Valve,Stainless Steel Butterfly Valve WENZHOU FOREVER CLASSIC TECHNOLOGY CO.,LTD , https://www.fballvalve.com
Henan stone mine new policy: mine rectification is not up to standard will be closed! Involved in 8 cities and 21 counties!
Abstract Recently, the “Three-Year Action Plan for Comprehensive Improvement of Open-pit Mines in Henan Province (2018-2020)†(referred to as “Programâ€) was introduced. Henan proposed to use three years to coordinate the promotion of environmental protection and safety development of open pit mines and effectively guarantee the rigid demand of mineral resources. To 2...