Pump-based acceptance

(1) When the pump foundation is handed over, there should be a certificate of quality and measurement record. On the basis of the base line should clearly draw the elevation of the baseline and vertical and horizontal centerline. The building should be marked with a coordinate axis. Important large-scale pump foundation settlement points should be observed. Today's latest valid order information free to send! Morning latest buyers information free to send! Punch grab Rob here! (2) The appearance of the pump foundation inspection, may not have cracks, honeycomb, hollow, rib and other defects. High temperature magnetic pump (3) According to the civil engineering drawings and pump technical documents, the pump base position, direction, height and dimensions of re-examination, the allowable deviation should be in accordance with the provisions of Table 2-35. Table 2-35 Allowable Deviation of Pump Base Size and Position mm Name of Substandard Permissible Deviation 1 Base Coordinate Position (Vertical and Horizontal Axis) ± 20 2 Elevation of Base Plane -20 3 Base on Flat Overall Dimension Hole size ± 20 -20 +20 4 Based on the level of the plane Full length per meter 5 10 5 Verticality per meter full length 5 10 6 Embedded anchor bolt Elevation (top) Center distance (root and top) 20 ± 2 7 Reserved anchor bolt hole depth center position hole wall verticality (full depth) ± 20 ± IO +10 8 embedded activities anchor bolt anchor elevation center position level (slotted anchor plate) level per meter Screw hole anchor plate) per meter +20 ± 5 5 2

Multiple Control Power Supply

Switchable Smart Film Glass Multiple Control Power Supply it could separate control several panels power on and power off.

Smart Film Multiple Control Power Supply, Smart Glass Multiple Control Power Supply

Shenzhen YuGuang New Material Co.,Ltd , https://www.ygsmartfilm.com