Entrance decoration restaurant decoration Gobo Moving Head Light,Led Beam Moving Head,Moving Head Spotlight,Mini Led Moving Head Light Big Dipper Laser Science And Technology Co., Ltd , https://www.bigdipper-laser.com
(l) After the completion of the project, the decorator shall notify the owner of the acceptance in written form. After receiving the notice, the owner must sign the project acceptance certificate within the acceptance period specified in the contract and within the same day after the acceptance. The project has not been accepted and the owner has used it in advance. , for acceptance criteria.
(2) In the inspection and acceptance, if it is found that the repairer has responsibility for quality problems and needs to be reworked or repaired, Party A and Party B shall agree on the remedial measures and deadlines, which shall be completed by the decoration company within the prescribed time limit.
(3) Since the acceptance date of the acceptance, the decoration company is responsible for the warranty on schedule. The damage caused by the improper use of the owner is not covered by the warranty.
How to determine the project acceptance and warranty at the time
How to determine the project acceptance and warranty period?