Construction Acceptance Three Trees Painted Floor Tiles Lacquer Switch LaTeX Sockets Windows Drawers Cabinet Doors Tiles Tiles Tiles Specifications Famous paintings refer to paintings with far-reaching influence and value, namely famous paintings. The so-called value is reflected in the author's own painting skills. The painting skills of the author of a valuable painting must be exquisite and unique. At the very least, they must have their own style and be different from others, so that they can be concerned. Secondly, it is not enough to have exquisite level, but also to reflect a spirit and a thought on the screen, that is to say, we should use painting to express our aspiration, and use artistic techniques to express something of a higher and deeper level. Famous Paintings,Most Famous Paintings,Famous Paintings And Their Meanings,Famous Paintings About Happiness The universe in the stone is great , https://www.zdsarts.com
[Construction Acceptance] About Home Inspection Decoration: Construction Specifications and Acceptance Criteria
First, the electrical construction standards and acceptance criteria 1, the electrician should be familiar with the circuit construction drawings or the owner's requirements before construction to ensure that all electrical appliances, switches, telephones, televisions, network outlet location.  2, switch, cassette positioning according to engineering requirements must be symmetrical, vertical and horizontal.  3, the purchase of all wires, telephone lines, television lines, network lines must meet the national testing standards to prevent product failure.  4, the circuit slotted laying, threading, inspection and testing. The wire connector is firmly loose and tightly fastened with a double insulating tape, leaving an access opening at the joint.  5, check all the lamps switch is flexible, whether the socket panel loose, prevent conduction, leakage occurs.  6, each circuit circuit is clear and reliable, in line with the requirements of electricity, fire line, zero line, wire to be color separation or marked.  7. Accept the owner's acceptance after signing without problems. Seal all the trunking and cassettes with cement mortar to ensure the normal construction of the bricklayers.  Second, waterway construction specifications and acceptance standards  1, to determine the location of all the hot and cold water fixtures, hot and cold water outlet elbow distance must be on a horizontal line, the outlet elbow spacing should not be less than 14.5 cm, in order to facilitate the installation of the triangle valve and faucet.  2. The purchase of aluminum-plastic pipes or PP-R pipes and accessories must meet the national testing standards and prevent poor-quality pipes from entering the construction site to avoid hidden dangers.  3, water channel grooved pipe and fittings, joints must be solid, do closed water test, check whether there is water seepage phenomenon, if any problems must be resolved immediately. Do a second test.  4, no problem, please sign the acceptance of the owner, with cement mortar sealed all the water pipes, on-site waste clean and delivered to the next team.   Third, tile construction standards and acceptance standards  1. In order to ensure that the progress of the progress of bricklayers before entering the construction site, all materials must be purchased in order to avoid delays in the construction period.  2. When bricklayers enter the site, it is necessary to determine the completeness of all demolition project positions (closing the door, wall, door) and painting.  3, the corner of the painting must be in a straight line, the walls of the plaster to achieve flat light.  4. The inlaid tiles shall be in accordance with the standards of interior decoration to find the elevation of the ground, calculate the number of vertical and horizontal slices according to the wall area, and pop up the horizontal line and the vertical control line.  5, tile section emissions, must pay attention to aesthetics, the straight section of the corner profile should be placed on the corner of the fall is appropriate.  6. Before construction, the tiles must be soaked in water for 2 hours (excluding all-ceramic tiles). During construction, all the floor drains should be kept clear and unobstructed. If there is any obstruction, you will find yourself at your own risk.  7. The colors of the paving tiles must be the same, and the varieties and specifications must conform to the design requirements. There must be no cracks or missing corners.  8, the wall and floor tiles should be firmly bonded. The four corners are stable, no lifting, no emptying, and other problems occur. All outlets and outlets open. The size must meet the requirements. Must not affect the overall appearance.  9. Brick seams of wall and floor tiles shall not be larger than 1.5 millimeters and evenly jointed. After the construction is completed, the owner shall sign and accept all bricklayers' garbage and clean them up.   Four, woodworking construction specifications and acceptance standards  1. Carpenters entering the construction site should be familiar with the construction drawings, look for all required projects, arrange the construction procedures, and pop up the horizontal lines of all rooms (if there is a suspended ceiling project, it should be constructed from top to bottom, and pop up the ceiling elevation line and hanging point construction).  2. The gap between the installation gypsum board must be 3mm, and the self-tapping screws must be recessed into the surface of the plasterboard.  3. The basic frame size of all wood products should be accurately divided and kept horizontal and vertical.  4, door and window cover production must be kept horizontal and vertical, flat and smooth floor, before painting latex, brushing glue must not have leaks, in order to facilitate the adhesion of the bottom layer of the panel.  5. When plying, the distance between the rows of nails must be the same, and the mosquito gun must be used when plying the panel.  6. The production of the door sleeve line and the window sleeve line must be strict with the 45-degree diagonal and the interface seam. The application of the line protruding panel should be handled with a small iron plane, and the surface layer of the panel must not be damaged during processing.  7. Accurately divide the dimensions of furniture production to prevent unnecessary influence when making cabinet doors. The corners of cabinet doors must be kept straight.  8, the protection of the cabinet is equally important, so that no string of nails clean, no glitches.  9, cabinet door installation seam size is uniform, the drawer mouth must be closed without burrs, all the cabinet door switch freely, drawer push-pull unimpeded.  10, do a good job of protection of finished products, not allowed to readily put the nails and construction tools on a good panel, so as not to have scratches affect the overall effect. Once the consequences are found at your own risk, the construction site must be kept clean and cleaned once a day.  11. Check all the finished wooden products again and make sure that there are no problems.   Fifth, painter construction specifications and acceptance standards  1, the bottom layer of wood products paint processing procedures, cleaning grassroots dirt, sanding with 320 fine sandpaper, brush primer again, color putty, greasy color must be consistent with the color of the surface board, nail holes, dry sanding after polishing Use a brown brush to sweep away all the dust. Brush the last time, after drying, use fine sandpaper to polish fine particles for example by issuing two to three times. Paint the same way as above. The last time the topcoat is painted, the filter should be used to filter the impurities in the paint and then paint the top coat to ensure that the surface is smooth and smooth. effect.  2, the wall and the top surface of latex paint, clean up the grassroots wall eradication, full approval of putty two to three times, sand to find repair traces, smooth sanding.  3, plasterboard ceiling self-tapping screws apply anti-rust paint brush again, then plaster all joints and self-tapping screws cross stitch flattened with sandpaper polished flat.  4, the corner of the gypsum board seam joint application kraft paper paste, kraft paper when the yin and yang corner must be in place, paste after the kraft paper with polyester paint closed to prevent peeling off, and then in a full batch of putty three times with fine sandpaper grinding smooth.  5, after the end of the latex paint, all the wood products on the latex paint should be promptly cleaned, and cleaned once, please sign the owner acceptance.