[Friends of this site] Shanghai Fireworks >>> Qi home DIY people share the bathroom to save money decoration experience Due to busy work, many owners have no way to go to the site during the renovation process. It is also not clear which part of the renovation is more important, and from time to time look at it. Since the landlord is not very familiar with the situation, he is just talking to the workers about the progress of the project. It is not clear what he should pay attention to. To address this situation, the pyrotechnics reminds you of the six links that must be present: Session One: Advancing to the bottom Before the renovation of the house, the owners, designers and construction team leaders communicate. In simple terms, it is generally necessary to ensure the contents of the three aspects and lay the foundation for the later work. The first is to confirm the design of the house. For example, it is clear where the pipe needs to be arranged and where it needs to be done. Second, we must determine the direction of the water and electricity coal. The third is to determine the changes in the structure of the housing. These need to communicate well with the construction team and the designers. They must be aware of what they are doing, and they should also lay a solid foundation for future projects. ★ Workers enter the stadium on the first day. The designer explains to the construction captain how it should be constructed. It contains many details. If the owner has any doubts, he can promptly make corrections. Session 2: Electric Tube Lines must arrive The landlord should go to the site to see before the hydropower line is sealed. It is mainly to ensure three aspects. First of all, the capacity of the wire cannot be greater than 40% of the tube, which is also specified in the 3.15 standard. The second thing to notice is that strong and weak electricity cannot be put in the same pipe. For example, computer network cables and wires cannot be worn in the same pipe. If this happens, it will not only affect the normal operation of the computer, but also may trigger security accidents. Finally, look at the place where the casing can't bend, because it's hard to get through the wire if it's concave. ★ The arrangement of electrical conduits should be as horizontal and vertical as possible. Strong and weak electricity lines must be separated by ≥ 30cm. Session 3: Materials must come This section needs to check whether the materials on the budget slip are consistent with the materials sent to the site. In the process of doing the survey by the owners, the owner often reports that the materials are sent to the wrong place. The industry carefully checked the brand and quality. If you only find it when you need it, it will bring unnecessary trouble to both parties. ★ The newly arrived brick wall tiles not only need to check the brand model, but also check the quality of the bricks to see if there is color difference. Session 4: Water pressure test must arrive After the water pipe is connected, it is necessary to do a hydrostatic test because it is not clear whether there is a leak in the welded joint. This test is very necessary, because only after doing the water pressure test can we ensure that there will be no water leakage in the future and we will only relax our mind on this part. Everyone now uses PPR pipes at home to be 1.5 times higher than the daily water pressure. No water leakage is found after one hour, and the water pressure does not decrease. ★The water pipe is also an important part of the hidden project. After the acceptance, the water pipe will be sealed immediately. In the event of a miss, there is no chance of remedial action. Section 5: Doing the Ceiling Structure Required First, check if the fulcrum around the wall is solid. It is also necessary to determine whether the wood keel is fireproof and antiseptic. Because the ceiling contains wires, electrical appliances, transformers, etc. In case of electric leakage, it will lead to burning, so you should see it clearly. ★ The structure of the ceiling is not simple, and it is suspended on top of our heads every day. We must ensure that its quality is safe and secure. The suspended ceiling and the top surface of the suspended ceiling are hammered with nailed nails (without the construction method of wood picks + wood rose) to make the ceiling safe and secure. Section 6: Gas installation must One of the first steps in this link is to check if there is a leak after the gas is installed. The second is to make sure that the location of the gas cannot be too close to the wire, otherwise an accidental spark may cause an explosion. ★ Because the shower is the intersection of water, electricity, and coal, the temperature will suddenly rise and fall during use, so it must not be taken lightly. Experience decoration design house decoration house housing electrical bathroom ceiling material bathroom design bathroom ceiling bathroom leak
LiteHome`s innovative design of LED Grille Light overturns the concept of commercial Linear Lighting. It can quickly replace traditional 2xT8 tubes lamps and traditional track lights. It also takes into account the function of spotlights to achieve precise angle adjustment without glare (UGR<16). More importantly, LiteHome takes into account the difficulty of replacement and installation. Our Grille Linear lights are compatible with commercial AC220-240V Track rails, which can be used as a fool-proof replacement. Users do not need to hire a professional electrician to replace the lamps and save every time. Electrician fee of 90-150USD per hour. Every design concept of LiteHome is placed in the situation for the users to consider seriously.
Supermarket Lighting,Shelf Lighting,Grille Light,Area Lighting,Commercial Lighting Suppliers SHENZHEN LITEHOME OPTOELECTRONIC TECHNOLOGY CO., LTD. , https://www.litehomelight.com
Netizens' Experience: Six Links to the Decoration