How to remove floor drains

Under normal circumstances, each bathroom has a floor drain, and the floor drain has a very large role in the bathroom. However, as time goes by, some Floor Drains are not deodorant or have been damaged. At this time, we must remove the floor drain and reinstall a new floor drain. So how to split the floor drain ? What are the precautions for installing floor drain? Let's take a look with Xiaobian.

First, how to open the floor drain

1. Before removing floor drains, pay attention to the specifications of floor drain gauges. In general, the most used bathroom in the home is a 10 cm*10 cm square floor drain, and there is also a 12 cm round floor drain. Secondly, the diameter of the water pipe is generally 5 cm.

2. The old floor drain panel and the joints of the tiles are slowly opened with tools. The cement is raised around the floor drain with a tool, and then the floor drain is hammered to separate it from the cement. After the floor drain is taken out, the original floor drain must be cleaned and the drain outlet must be plugged in to prevent foreign matter from falling into the pipeline.

Second, install the leakage precautions

1. Through the above explanation of how to split the floor drain, did my friends learn? The ground leak must be put back. First, the position of the floor drain must be lower than the ground so that better drainage can be achieved. Secondly, before installing the floor drain, if the drain pipe is close to the ground, the drain pipe must be cut off so that the installed floor drain is lower than the ground.

2. But you can't go too far in pursuing a floor drain that is lower than the ground, because it will destroy the overall home improvement effect. Therefore, if the distance between the drain pipe and the ground is too far, cement can be used for filling. This will not only enhance the drainage effect, but also provide a better decorative effect after installation.

3. In the case of floor drain installation, to prevent foreign matter from falling into the drain port, the drain port should be plugged and packaged, and the plug should be removed when the drain is installed.

4. When cement is applied to the drainage outlet, it is not allowed to place the floor drain on it, and it should be replaced with other materials so as not to soil the floor drain.

5. When the floor drain and the drain pipe are docked, first fill the surrounding pores with cement, then adjust the floor drain to a suitable position, then use the mortar to solidify, and then put the floor drain into the formed pipe. Floor drains and pipes fit tightly together.

The editorial summary; the above is about the ground drain how to remove and install the ground leakage precautions related to the elaboration, hoping to help my friends. If you need to learn more about ground drain, you can always pay attention to us. The following articles will be more exciting.

Thermostatic Concealed Valves

Thermostatic Concealed Valves,Thermostatic Shower Head,Hand Spray ​Shower Faucet,Ceiling Mounted Shower Faucets

kaiping aida sanitary ware technology co.,ltd , https://www.aidafaucet.com