Home renovation budget 1. A summary of the budget for the preparation of decoration works. The architectural decoration project is an important part of the construction project. It includes interior and exterior decoration and facilities. The decoration project shall use the “fixed amount, market price†and a once-inclusive way to compile the budget for the decoration project. Market price: The material price and wage unit price are calculated based on the market price. The role of the budget for decorative works is: It is the basis for bidding, bidding and evaluation of construction units and construction companies. Several factors that determine the level of budget quotations: Decoration budget knowledge entrance decoration children's room decoration decoration design room family decoration door price home decoration budget table home decoration budget floor tile home improvement home home design drawing decoration home Rainfall Shower Head, Hand Held Shower Head, Stainless Steel Shower Head, Bathroom Shower Head ZHEJIANG KINGSIR VALVE CO., LTD. , https://www.kingsir-valve.com
Fixed amount: The amount of main materials used and the number of days of artificial labor determined in accordance with the relevant provisions of the design drawings and the estimated budget quota.
Machinery costs: Calculated mechanical costs are calculated according to the fixed mechanical costs. -
The project direct fee is determined by the quota amount and market price, and the company's operating expenses, profits, taxes, etc. are calculated and the total construction cost of the project is calculated. 0
It is the basis for signing the contract, drawing the project payment and project settlement for the construction unit and the construction company.
It is the basis for construction companies to plan, implement economic accounting, and assess business results.
The decoration project budget is based on the preparation basis, steps and costs.
Preparation basis:
Construction drawings, current quotas, unit price, standards, decoration construction organization design, budget manual and building materials manual, construction contract or agreement.
Preparation steps:
Familiar with the construction drawings; Calculate the amount of work; Calculate the direct cost of the project; Calculate other expenses; Check the check; Write the preparation instructions, fill in the cover, and bind the book.
The composition of the fee:
The cost of construction and decoration projects consists of direct engineering fees, business operating expenses and other expenses.
Direct fee: The direct fee includes labor costs, material costs, construction machinery usage fees, site management fees, and other expenses.
Corporate operating expenses: refers to the management fees and financial expenses incurred by the company's operating management and building decoration management departments.
Other expenses: There are mainly profits and taxes.
Decoration offer should pay attention to matters:
The quotation must indicate the size, practice, materials (including brand, model or specification), unit price and total price of each item. Must provide detailed practices and materials and templates.
Pay attention to whether or not the renovation project requested by the customer is underreported.
The housing conditions of the decoration households also have a great impact on the decoration construction price. This mainly includes:
Ground: Regardless of the cement plaster or the floor of the floor tile, attention must be paid to its flatness, including the flatness of the single rooms and the floor of each room. The degree of flatness has a great influence on the price of decoration construction such as paving tiles or flooring.
Wall: The flatness of the wall must be measured from three aspects. The solid angle formed between the two walls and the ground or the top surface should be straight. The angle between the two walls should be vertical. The single wall should be flat and free from undulations. No bending. These three aspects are related to the construction unit price of the floor covering and wall decoration.
Top: The flatness can refer to the ground requirements. Light tests can be used to see if there is a large shadow to clarify its flatness.
Doors and windows: Mainly check whether the horizontal and vertical joints between the door and window fan and the cabinet are even and dense.
Kitchen and toilet: Pay attention to whether the floor is tilted toward the floor drain; how waterproof is the floor surface; waterproofing around the ground pipes (water, coal, and warm water pipes); whether there are local cracks, water marks and mildew on the wall or the top; Whether there is a drip, whether the water is unobstructed, and whether the location of the existing washbasin, toilet, bath, vegetable-washing area, and cooktop is reasonable.
Determine the reasonableness of the budget quote.
There are currently two types of fees for home improvement:
One is based on the Beijing Municipal Urban and Rural Construction Committee decoration project budget scale fees.
The other is based on the home decoration project reference price charged by the China Building Decoration Association. It adopts a comprehensive quotation to include all expenses and profits, and does not include individual charges. The current home decoration market uses this method. See the reference price of artificial household decoration engineering labor costs (2008 official version) issued by Shanghai Building Decoration Association.
Material specifications, grades, room design functions, selection of construction teams, level of qualifications of construction teams, good or bad construction conditions, ease of construction process;
Home decoration payment.
At present, Bujia Home Decoration Co., Ltd. usually takes a deposit of 500 yuan before the renovation, and receives 60% of the project payment after signing the contract. After the project is completed, it will receive 30% of the project payment, and 10% of the balance will be collected after the completion of acceptance.
Home renovation budget