Double Side Bearing Ring Machine Double Side Bearing Ring Machine,Uc Bearing Turning Machine,Inserts Bearing Turning Machine,Double Slide Turning Machine Shaoxing Sunfong Intelligent Equipment Inc. , https://www.zjsxsunfong.com
Pump to be installed like this
Oil pump is a commonly used tool for conveying oil, which is widely used in production and life. A pump from the purchase to put into use need to go through many aspects. The biggest part is the installation of the pump. General installation of pumps have a professional technical staff, but in the absence of technical staff how to install the pump when it. Next, we introduce the correct installation of the pump order, so that we can install the pump yourself. Pump installation order: 1, the unit on the foundation buried in the bolt, between the base and the base, with a pair of wedge pad with the calibration. 2, release the coupling large, respectively, with the spirit level on the pump shaft and base, by adjusting the wedge pad, the unit level correction, appropriate tightening anchor bolts to prevent ambulation. 3, the correction of the concentricity of the pump shaft and the motor shaft, the outer diameter of the shaft in the joint, allowing the deviation of 0.1 mm; two coupling plane clearance should be guaranteed 2 to 4 mm, (small pump to take a small value) Tolerance of 0.3 mm. 4, pick up the pipeline and determine the direction of motor rotation, then connect the coupling, and then check the concentricity of the shaft again. 5, the actual test run in the unit after 2 to 3 hours for the final inspection, if no bad phenomenon, then that the installation of qualified. In the process of testing the bearing temperature and vibration check as follows: 6, during the installation process, in order to prevent debris falling into the machine, all the holes of the unit should be covered. 7, to prevent debris in the pipeline into the pump, the newly installed pipeline, the pump should be installed gel filter, the effective cross-section should be greater than 2 to 3 times the suction tube cross section. Mastered the correct installation of the pump order, we can count as a half-way out of the technical staff, the use of the pump in the future will often use this skill.