Bathroom waterproof nine details

The bathroom is an extremely important area for every household, but it is wet and water all year round, so the waterproof measures in the bathroom are essential. Here Jiuzheng Building Materials Network Xiaobian teaches you nine details of waterproof bathroom, I hope to bring help to everyone.

First, the ceiling: Because the water vapor in the bathroom is heavier, it is necessary to choose materials with waterproof, anti-corrosion and anti-rust characteristics.

Second, the ground: Before laying the floor tiles, be sure to do waterproof; after the tiles are laid, ensure that the brick surface has a water discharge slope (usually about 1% is appropriate), the slope is facing the floor drain; the ground must be done after laying the tiles For closed water experiments, the time must be at least 24 hours; when laying the floor tiles, pay attention to the seams and alignment with the wall tiles to ensure the overall sense of the whole bathroom, so as to avoid a visually messy impression.

Third, the wall: the tile on the wall should also be moisture-proof and waterproof, and it should be flat when tiling, and should be seamed and aligned with the floor tile to ensure the overall feeling of the wall and the ground; The cut of the tile should be small and appropriate, and the flange cover on the water heater can be easily covered to make the appearance perfect.

Fourth, doors and windows: the bathroom is best to have windows for ventilation; if there is no window, pay special attention to the details of the door. In order to prevent the water from overflowing in the bathroom, the door boundary should be slightly higher than the inner side of the bathroom; the gap between the door and the floor of the bathroom should be kept larger to facilitate the return air; if it is a sliding door, the sliding door and the bathroom should be Make a layer of waterproof between the tiles.

Fifth, the circuit laying: the wire joints in the bathroom must be tinned, and must be wrapped with waterproof tape and insulating tape to ensure safety; the wire body must be covered with flame retardant pipe; all switches and sockets must have moisture-proof box, and the position It depends on the size and location of the appliance to ensure convenient and reasonable use.

Sixth, the waterway transformation: the water supply and drainage lines between the bathrooms should not be changed too much, if you want to change, depending on the specific circumstances, such as the different models of the washing machine, the location of the water will be different.

Seven, sanitary ware installation: It is best to remember the distance of the water hole before the decoration, according to the size of the bathtub, bath room, toilet, wash basin and other sanitary ware, so as not to be unsuitable in the decoration; toilet installation must first sit The mud is sealed and then fixed with expansion screws or glass glue, which is easy to repair when the toilet is blocked.

8. Ventilation and ventilation: There must be an exhaust fan in the bathroom, and the exhaust fan must have a reverse gate to prevent the dirty air from flowing backwards.

9. Greening: Adding anger. The bathroom should not be a corner forgotten by the green. During the decoration, you can choose some shade-resistant and wet pots to be placed in the bathroom, which makes the place a little more angry.

Jiuzheng Building Materials Network Xiaobian summary: the nine details of the bathroom decoration noticed, in order to create a beautiful and comfortable bathroom, life is more comfortable!

Cup Testing Machine

Cupping Testing Machine,Automatic Cup Test Machine,Cup Test Machine,Cup Testing Machine

Jinan Chenda Testing Machine Manufacturing Co., Ltd. , https://www.jncdtester.com