1, the bottom layer of wood products paint processing procedures, cleaning grassroots dirt, sanding with 320 fine sandpaper, brush primer again, color putty, greasy color must be consistent with the color of the surface board, nail holes, dry sanding after polishing Use a brown brush to sweep away all the dust. Brush the last time, after drying, use fine sandpaper to polish fine particles for example by issuing two to three times. Paint the same way as above. The last time the topcoat is painted, the filter should be used to filter the impurities in the paint and then paint the top coat to ensure that the surface is smooth and smooth. effect. 2, the wall and the top surface of latex paint, clean up the grassroots wall eradication, full approval of putty two to three times, sand to find repair traces, smooth sanding. 3, plasterboard ceiling self-tapping screws apply anti-rust paint brush again, then plaster all joints and self-tapping screws cross stitch flattened with sandpaper polished flat. 4, the corner of the gypsum board seam joint application kraft paper paste, kraft paper when the yin and yang corner must be in place, paste after the kraft paper with polyester paint closed to prevent peeling off, and then in a full batch of putty three times with fine sandpaper grinding smooth. 5, after the end of the latex paint, all the wood products on the latex paint should be promptly cleaned, and cleaned once, please sign the owner acceptance. Paint engineering puddle three trees paint latex paint Temperature and Humidity Controller Temperature And Humidity Controller,Automatic Temperature And Humidity Controller,Temperature And Humidity Controller With Sensor,Autonics Temperature And Humidity Controller Yuyao Gongyi Meter Co.,Ltd. , https://www.yycj.com
Painter construction specification and acceptance standard