The terrazzo floor is a kind of composite ground material with cement as the main raw material. Its low cost and good performance are widely used in large-scale public buildings. Many people may not understand the construction method of the terrazzo floor . The following small series briefly introduces the construction method of the terrazzo floor . · Terrazzo process flow: Grass-roots processing → Finding elevation → Horizontal bombing → Spreading and screeding mortar → Curing → Blocking line → Inserting grid → Mixing terrazzo mix → Brushing the cement slurry layer → Laying the terrazzo mixture → Rolling, Smoothing → Grinding → Coarse grinding → Fine grinding → Polishing → Oxalic acid cleaning → Waxing · Terrazzo ground handling process 1, do the screed (1) Playing ash cake and making gluten: practice cement mortar coating on the same floor. (2) brush prime cement paste layer: practice the same floor cement mortar surface. (3) Spread the leveling layer of the cement mortar: Use 1:3 dry-hard cement mortar for the leveling layer, level the mortar first, and then use a pressure rule to flatten the screed, then use a wooden trowel to grind and compact, and require the surface to be flat and dense. Keep it rough. After the screed has been wiped, the next day should be watered for at least one day. 2, sub-tile mosaic (1) After the screed layer is cured for one day, the vertical and horizontal two-direction or pattern ink line will be ejected on the screed layer according to the design requirements, and then the sliver line will be cut according to the ink line. (2) Using pure grout in the lower part of the grid to form a splayed corner, the seat is embedded firmly (about 30 degrees with the screed), and the copper wire should be buried well. The smearing height of the pure grout should be 3 to 5 mm, which is lower than the grid height. The grid should be inlaid firmly, the joints are tight, the top surface is on the same plane, and the pass line is to check the flatness and straightness. (3) After the grid bars are inlaid, watering maintenance shall be started every 12 hours, and at least two days shall be maintained. Information on the construction method of the terrazzo floor was introduced here for everyone. I hope this article will help you. If you still have anything you don’t understand, you can follow our website and we’ll get back to you as soon as possible. Terrazzo Floor Construction Installation Curtain Installation Method Construction Bottoming Decoration Construction Knowledge 730W Led Grow Light Indoor Plants The 730W LED Plant growth Lamp is a high performance plant lighting device that uses LED (light emitting diode) technology to provide the spectrum and brightness required for plant growth.
5. Space saving: 730W LED plant growth lights are usually compact in design and can be installed in smaller Spaces, suitable for indoor planting or small farming facilities.
horticulture led grow lights for greenhouse,led grow light bar,high yields led grow lights Shenzhen Pvison Technology Co., Ltd. , https://www.pvisunggrowlight.com
LED plant growth lamps have the following features and advantages:
1. High efficiency: LED lamps have the characteristics of high energy efficiency and low energy consumption, compared with traditional fluorescent lamps or high-pressure sodium lamps, LED plant growth lamps can provide higher light intensity with lower power, thus saving energy costs.
2. Full spectrum: 730W LED plant growth lights can provide the full spectrum of light required for plant growth, including blue, red and other wavelengths of light. These spectra are very important for photosynthesis and growth and development of plants.
3. Adjustable spectrum: Some 730W LED plant growth lamps have the function of adjustable spectrum, which can adjust the proportion of spectrum according to different plant growth stages to maximize the growth and development of plants.
4. Long life: LED lamps have a long life, usually reaching more than 50,000 hours, which is longer than the traditional lamp life, reducing the frequency and maintenance costs of replacing the lamp.
Terrazzo floor construction method