Plastering, scraping, putting on tiles, etc., are susceptible to problems such as emptying. In particular, when painting paint, it is necessary to pay attention to “warmthâ€. After the paint is fully dried, the doors and windows can be opened and ventilated, and sand can not be allowed to fall on the undried paint surface. Whether it is mixing mortar or spraying a variety of paints, it is best not to construct it in the open air and avoid all kinds of stains falling into it. The impact of spring decoration on wood is mainly reflected in both temperature and humidity. If the temperature is too low or too high, adverse reactions of the material may occur, curling or even cracking. Especially in the current wood market, various types of companies have a wide range of products and the quality is uneven. The reporter suggested that consumers should choose some of the more well-known brands. Prevent dry and dampness on both sides If the temperature of the spring decoration is too low or too high, adverse reactions to the material may occur, curling or even cracking. In particular, various types of products in various types of companies in the current timber market have a wide range of products and their qualities are uneven. It is suggested that consumers should choose some of the more well-known brands. In addition, the main material should be prepared in advance, and it is better to place it in the room with heating equipment for 3 to 5 days so that the moisture content of the wood is close to the level inside the house so as not to deform in the future. After the timber is transported into the decoration site, it should be avoided to put it in a ventilated place, otherwise the air drying will quickly lose its internal moisture and cracks appear. When the humidity is low, it is necessary to reduce the ventilation, and put a pot of water near the heating facility to promote evaporation, so that the wood can survive the spring. Wood products sealed in time The wood in spring is easy to be brittle and may not be visible at the beginning of cracking. However, if the sealing work of the painter is not timely, it is easy to cause cracks on the veneer surface of the veneer, which affects the aesthetics and its service life. For the wood line used as the edge, the moisture content is higher than that of the veneer. After the processing is completed, the surface should be sealed with oil as soon as possible, otherwise shrinkage will occur, which will affect the appearance of the veneer. Do not forget the expansion joints on the wooden floor In the spring when the air is wet, when workers lay wooden floors, expansion joints of about 2 mm are indispensable, otherwise drums and dangling will occur easily in the future. If there is a phenomenon such as leakage of heat from the heater or accumulation of water on the wooden floor, it must be wiped in a timely manner. Do not allow it to be exposed to direct sunlight or baked in an electric oven to avoid excessive drying and cracking of the floor. In order to prevent deformation, the floor on both sides of the wall can be dismantled, and the moisture can be dispersed before reinstalling. Construction work must be "warm" Plastering, scraping, putting on tiles, etc., are susceptible to problems such as emptying. In particular, when painting paint, it is necessary to pay attention to “warmthâ€. After the paint is fully dried, the doors and windows can be opened and ventilated, and sand can not be allowed to fall on the undried paint surface. Whether it is mixing mortar or spraying a variety of paints, it is best not to construct it in the open air and avoid all kinds of stains falling into it. Change outside window and save time Many homes will replace ordinary windows or aluminum alloy windows with plastic steel windows during renovations. Some installation workers have plans to save time. The fixing of plastic steel windows is not very solid. This will cause the outer window to be blown or deformed by the wind, and will be slid later. It will become difficult to open, and it will cause rain to flow into the room in case of rain. Therefore, the external window must be closely inspected, and secondly, whether or not the cement mortar around the external window is sealed is an important aspect that should be taken into account when checking. Otherwise, the room will leak air during the later period of time. Home decoration tricks three tree paint window paint interior decoration paint room floor tile floor tile ld tile
Bauhinia European wallpaper
Spring decoration knowledge: protection of decoration materials attention to dry moisture