Many consumers have such experience. After investing a lot of money and spending a lot of effort, they finally ushered in a renovated new house, but found that the decoration quality problems abound, and the settlement of the decoration is often more than the contract The amount of money is much greater, and it makes consumers feel deceived. Some sensible consumers had to find decoration and decoration supervision companies to carry out acceptance assessments, and some even went to the courts to seek justice. The supervising company’s senior supervising engineer analyzed the reasons for this phenomenon to reporters. The reason why consumers were cheated was mainly because they did not understand professionalism. In addition, some industry fraudsters resorted to discounted price cuts and other means to trick those who are looking for low-cost to sign contracts at low prices. When consumers paid for the first payment, they had already given you a good word "trap" in the contract. >>> Link: Beware of Home Clearing Trap For this reason, the supervising engineer reminds the majority of decoration owners that they should pay special attention to the following points in the renovation: 1. Refused to recruit units or individuals who do not make money or discounts. Home Furnishing Stuffy Experience Talk Decoration Design Decoration Company Decorating Decorating Decorating Decorating Decorating Company Okay Modeling Room Picture Decorating Modeling Room Picture Modeling Room Designing Homewear Modeling Room Decoration Modeling Room
2. The home decoration should have a cost budget procedure: material costs, construction costs, management fees, profits, etc. should be clear, and decoration companies or construction teams that do not have credibility, quality, and service guarantees often take the “low open high†offer Practice contract business.
3. Be vigilant against the selection of decoration companies or individuals to leak project items. They often use customers who do not understand the decoration, so they are interested in missing items on the construction project list, and then add additional items during the construction period.
4. Reject materials shoddy. The materials on the quotation are inconsistent with the actual use. In particular, the grassroots use counterfeit materials to reduce costs. Or intends to increase the material loss, and increase the amount of work under the name of loss.
5. Be careful of the construction team to reduce construction procedures, cut corners, and reduce costs. If the brush should be brushed with only six brushes, the cement is shoddy, and the wooden substrate is not firmly treated. All of them become nail connections, and the proportion of latex paint is not equal.
6. The use of popular package pricing methods to deceive customers, seemingly scientific, practical projects vague.
7. Before the renovation, they tried to brag about and contract business. After the decoration was completed, quality problems appeared and they fled. Quality and maintenance became major problems.
8. We must not give up the principle of coveting a small bargain and earnestly choose a reputable and capable decoration company to respect its reasonable profits from its labor.
9. To clarify the materials, construction procedures and service items required by the contract prior to the signing of the contract, check the names, materials, quantities, practices, unit prices, and total prices of the items listed in the quotation, and ask the designers to provide “pre-evaluation of environmental protection. "Reports.
10.Indicate relevant matters such as addition and subtraction items, and specify the detailed construction practices and material name on the construction drawing as an attachment to the contract.
11. Be sure to specify the proportion of non-owner's willingness to increase the amount of the project, generally not exceeding 10%.
12. Before signing a contract with a construction company, we must talk about the idea of ​​owning a decoration supervisor. If the construction party tries to resist, the owner must take extra care.
13. Do not rely on the model room. Accept the project quality with national standards. It is best to look at the "Photo Gallery of Bad Projects" before choosing a company.
14. At the time of signing the contract, the name and origin of the foreman responsible for the project must be clearly stated and the company should be prevented from temporarily hiring the construction team.
15. The proportion of prepayments must be reduced as much as possible. It is better to implement the "3331" system so that you can take the initiative.
16. Ask the company for a photocopy of the business license, a photocopy of the qualification certificate, and check the legality of the company with the competent construction department or supervision company.
17. It must be noted when paying the design deposit. "If the owner is not satisfied with the design plan, he shall refund the design deposit in full."
18. It is better to use several design schemes to compose a complete design scheme by the owners. There are 3 to 5 construction units quoting and the owners can choose.
Experts Weapons Safe to escape the decoration trap