Bathroom waterproofing: the steps are clear and handle

It is a painful thing to decorate the house bathroom waterproofing! It is not only for the comfort of our living, but also for the neighborhood and the safety of the floor. The following decoration home decoration network Xiaobian will introduce the relevant knowledge of bathroom waterproofing practice for everyone!


卫生间防水


Bathroom waterproofing practices:

1. The floor of the bathroom is paved with cement mortar, and the direction is the direction of the floor drain. The slope of the bathroom door is relatively small, and the slope of the floor drain will be relatively large.

2. Pipeline through the root of the floor and the location near the floor drain to enhance waterproofing. The tube root building is sealed with a sealing paste. After the smoothing of the corner of the cement, when the waterproof coating is applied, the reinforcing layer of the glass cloth is 1 to 2 layers.

3. The wall of the bathroom should be treated flat, no small particles, and no floating ash hanging. Wipe the small corners or slopes at the junction of the wall and the ground. When the waterproof coating is applied, the reinforcing layer of the glass cloth is 1 to 2 layers.

4. For the total thickness of the polyurethane waterproof coating film, the requirement is ≥15mm, first brushed at the bathroom tube root and the corner reinforcement layer, and then brushed and scraped a large area after 4 hours under normal temperature conditions. There should be no slipping and bubbling. After 24 hours of curing, apply the next layer.

5. After painting the facade of the bathroom, apply the plane, and the direction of the next pass is perpendicular to the previous one. When the last coating is semi-cured, the coarse sand is thrown, which makes it easier to combine with the cement mortar.


卫生间防水做法


6. The floor waterproof layer of the bathroom should be painted to a position of 300 mm outside the doorway. The waterproof layer of the waterproof floor should be 200 mm away from the ground.

7. Perform a 36-hour water shut-off test in accordance with the relevant requirements. It is recommended to discuss the downstairs neighbors corresponding to the bathroom.

Regarding the waterproofing practice of the bathroom , the decoration house decoration network Xiaobian will introduce so much for everyone, the owners can communicate with the decoration master according to their own bathroom situation. For more related knowledge, please pay attention to the decoration encyclopedia section!

The ceramic ring is a new type of material formed by Zirconia Ceramic material and sintered. The ceramic ring of Zirconia Ceramic Ring forming process is formed by grade pressure or dry pressing, and can be sintered at high temperature into ceramic rod blank. Finished by polishing, chamfering, fine grinding, etc.; the outer diameter of the ceramic ring can be up to 200mm, and the dimensional accuracy can be accurate to 0.001mm.


Zirconia Ceramic Ring

Zirconia Ceramic Ring,Non-Standard Alumina Ceramic Parts,Standard Industrial Ceramic Yellow,Zirconia Ceramic Oven Parts

SHENZHEN HARD PRECISION CERAMIC CO.,LTD , https://www.hardcm.com